EPSOM E7105T Скачать руководство пользователя страница 2

EPSOM – E7105T                                                                                                                                                         2 

 

 

For assembly advice or parts go to 

www.warehousefurniture.co.nz

 or call 0800 100 858  

RH Drw Side – narrow  340 x 115 x 12mm 

Plain 

RH Drw Side - deep 

340 x 160 x 12mm 

Plain 

Drawer Back – narrow  700 x 110 x 12mm 

Plain 

Drawer Back – deep 

700 x 155 x 12mm 

Plain 

Drawer Bottoms 

710 x 339 x 4mm 

Plain 4mm 

Back Panel - tongue 

962 x 387 x 4mm 

Plain 4mm – tongue on one long edge 

Back Panel - groove 

962 x 387 x 4mm 

Plain 4mm – groove on long edge 

 

HARDWARE LIST 

 

QTY 

PART 

CODE 

 

20 

Connecting Bolts 

H1 

 

10 

15mm Metal Cams. 

H2 

 

10 

12mm Metal Cams. 

H3 

 

20 

Drawer Slide Screws 

H4 

 

20 

Small Screws 

H6 

 

20 

Screws 

H9 

 

20 

Large Dowels 

H15 

 

Bag of small Nails 

H27 

 

Bow Handles 

 

 

Metal Drawer Slide sets 

 

 

4  

Nail on Glides 

H37 

 

 

Содержание E7105T

Страница 1: ...assembling your cabinet The measurements will help you identify each part If any parts are missing or damaged please contact us directly for replacements and advice Do not call the store you bought th...

Страница 2: ...155 x 12mm Plain 5 Drawer Bottoms 710 x 339 x 4mm Plain 4mm 1 Back Panel tongue 962 x 387 x 4mm Plain 4mm tongue on one long edge 1 Back Panel groove 962 x 387 x 4mm Plain 4mm groove on long edge HARD...

Страница 3: ...defective material or workmanship excluding misuse and normal wear and tear Obviously as this unit is customer assembled we cannot guarantee cabinet failure or damage from incorrect assembly All clai...

Страница 4: ...g to the drawers later on LEFT HAND PART CL RIGHT HAND PART CR The Drawer Slide components shown above are to be attached to the cabinet They have letters CR or CL stamped on them to indicate left han...

Страница 5: ...rew them to the RH End using the H4 Drawer Slide Screws H4 Insert two H2 Cams as shown in diagram Make sure the arrow on the top of the Cam points towards the top edge of the End H2 Push two H15 Dowel...

Страница 6: ...EMBLE THE CHEST STEP 1 Attach the Rail and Toeboards to the LH End Position the Rails and Toeboards over the Connecting Bolts installed in the End take note of the drawing below Ensure the laminate si...

Страница 7: ...LH End with the Rail and Toeboards attached onto its back edge Fit the RH End to the Rails and Toeboards by fitting the Connecting Bolts in the RH End into the Cams in the Rails and Toeboards as shown...

Страница 8: ...Top onto it s back edge and slide it onto the top of the Ends as shown below Fit the Connecting Bolts down into the Cams in the Ends Turn all four Cams in a clockwise direction to lock the Top to the...

Страница 9: ...o pieces 1 x Panel with a tongue on the long edge 1 x Panel with a groove on the long edge Fit the Back Panel with the groove to one side of the Tallboy Partly tap a couple of nails into the corners t...

Страница 10: ...Epsom Tallboy will have one shallow top drawer and four deeper bottom drawers All Drawers are constructed in the same manner and consist of the same parts STEP 1 Install the hardware as shown below No...

Страница 11: ...H and RH Drawer Sides by fitting them down into place over the Connecting Bolts installed in the Drawer Front Turn the Metal Cams clockwise to lock the Drawer Sides in place Next slide the Drawer Bott...

Страница 12: ...screws H6 Screw STEP 4 Attach the Drawer Handles to the Drawer Front using the screws provided Fit the drawers into the cabinet Make sure that the rollers at the back of the drawer go behind the fron...

Отзывы: