Epsolar Tracer-1206RN Скачать руководство пользователя страница 9

5

 

Step 1: Choose Mounting Location 

Locate  the  Tracer  on  a  vertical  surface  protected  from  direct  sun,  high 

temperature, and water. 

Step 2: Check for Clearance 

Place  the  Tracer  in  the  location  where  it  will  be  mounted.  Verify  that  there  is 

sufficient  room  to  run  wires  and  that  there  is  sufficient  room  above  and  below  the 

controller for air flow.   

Figure 3-1    Mounting and cooling 

Step 3: Mark Holes 

Use a pencil or pen to mark the four (4) mounting hole locations on the mounting 

surface. 

Step 4: Drill Holes 

Remove the controller and drill four sizeable holes in the marked locations.

 

 

Step 5: Secure Controller 

Place the controller on the surface and align the mounting holes with the drilled 

holes in step 4. Secure the controller in place using the mounting screws. 

3.3 Wiring 

 

NOTE:  A  recommended  connection  order  has  been  provided  for  maximum 

safety during installation. 

 

NOTE: The Tracer is a negative ground controller. Any negative connection of 

solar module, battery or load can be earth grounded as required. Grounding is 

recommended. 

 

 

 

Warm air

 

 

150mm

 

150mm

 

Cool air

 

Содержание Tracer-1206RN

Страница 1: ...ting our product This manual offers important information and suggestions with respect to installation use and troubleshooting etc Please read this manual carefully before using the product and pay at...

Страница 2: ......

Страница 3: ...Max PV Input Voltage Tracer 1206RN 60VDC Tracer 1210RN 100VDC Tracer 1215RN 150VDC Max PV Input Power 12V System 130W 24V System 260W Array voltage should never exceed maximum PV input voltage Refer t...

Страница 4: ...3 1 General Installation Notes 4 3 2 Mounting 4 3 3 Wiring 5 4 Operation 10 4 1 MPPT Technology 10 4 2 Battery Charging Information 11 4 3 LED Indications 13 4 4 Setting Operation 16 5 Protections Tr...

Страница 5: ...for safe and proper operation of the controller NOTE Indicates a procedure or function that is important for the safe and proper operation of the controller General Safety Information Read all of the...

Страница 6: ...ent thermal design and nature air cooling RJ45 interface with remote meter MT 5 convenient to check operating parameters of controllers The Tracer series controller is for off grid solar system and co...

Страница 7: ...system errors 4 Setting Indicator Corresponding indicator will be on when set timer1 timer2 and battery type 5 LED Digital Display Display the load work mode and status 6 Setting Button in manual mod...

Страница 8: ...entilation to release the gasses Avoid direct sunlight and do not install in locations where water can enter the controller Loose power connections and or corroded wires may result in resistive connec...

Страница 9: ...ur 4 mounting hole locations on the mounting surface Step 4 Drill Holes Remove the controller and drill four sizeable holes in the marked locations Step 5 Secure Controller Place the controller on the...

Страница 10: ...ARNING Risk of explosion or fire Never short circuit battery positive and negative or cables Figure 3 2 Battery wiring Before connecting the battery measure the battery voltage It must be over 9V to p...

Страница 11: ...s time Confirm the connection correct and then turn on the power If wiring the load connection to a load distribution panel each load circuit should be fused separately The total load draw should not...

Страница 12: ...Refer to the instructions provided for detailed installation procedures Step 5 Confirm Wiring Double check the wiring in step1 through 4 Confirm correct polarity at each connection Verify that all si...

Страница 13: ...firm Power up When battery power is applied and the Tracer powers up the battery led indicator will be green If the Tracer does not power up or battery status LEDs error exists refer to Section 5 Trou...

Страница 14: ...is true 1 Power Into the Tracer Power Out of the Tracer 2 Volts In Amps In Volts Out Amps Out Assuming 100 efficiency Actually the losses in wiring and conversion exist If the solar module s Vmp is gr...

Страница 15: ...d energy compared to traditional controllers Conditions That Limits the Effectiveness of MPPT The Vmp of a solar module decreases as the temperature of the module increases In very hot weather the Vmp...

Страница 16: ...ery is fully recharged there will be no more chemical reactions and all the charge current transmits into heat and gas at this time Then the Tracer reduces the voltage to the floating stage charging w...

Страница 17: ...specific requirements of the battery used in the system Certain types of batteries benefit from periodic equalizing charge which can stir the electrolyte balance battery voltage and complete chemical...

Страница 18: ...range GREEN FLASHING when battery full ORANGE ON when battery under voltage RED ON when battery over discharged Please refer to Chapter 5 for troubleshooting Battery LED indicator Table 4 2 Color Indi...

Страница 19: ...gital tube displays C PV Overcurrent Load indicator When the load amp is 1 25times of rated current for 60 seconds or the load amp is 1 5 times of rated current for 5 seconds overload or load short ci...

Страница 20: ...hold Voltage the solar controller will recognize the starting voltage and turn off the load after 10 minutes delay 2 Light ON Timer 1 15h on When solar module voltage goes below the point of NTTV Nigh...

Страница 21: ...pe When timer 1 setting indicator is on press the setting button for more than 5 seconds till the LED digital tube flashes Then press the setting button till the desired number appears according to th...

Страница 22: ...minutes delay since sunset 6 Load will be on for 7 hours after ten minutes delay since sunset 7 Load will be on for 8 hours after ten minutes delay since sunset 8 Load will be on for 9 hours after te...

Страница 23: ...on for 11 hours before sunrise 11 Load will be on for 12 hours before sunrise 12 Load will be on for 13hours before sunrise 13 Load will be on for 14 hours before sunrise 14 Load will be on for 15 hou...

Страница 24: ...ng short circuit After one automatic load reconnect attempt the fault must be cleared by reapply power or pressing the setting button PV Reverse Polarity Fully protection against PV reverse polarity n...

Страница 25: ...r cut off the output automatically LED indicator will return to green automatically when fully charged LED digital tube displays P PV Overvoltage Check whether the PV parameters match with the control...

Страница 26: ...rnt wire connections Check and confirm that LED digital tube is consistent with required Pay attention to any troubleshooting or error indication Take necessary corrective action Confirm that all the...

Страница 27: ...of date and place of purchase To obtain rapid service under this warranty the returned products must include the model serial number and detailed reason for the failure the module type and size type o...

Страница 28: ...g Gel Sealed Flooded High Volt Disconnect 16V x2 24V 16V x2 24V 16V x2 24V Charging limit voltage 15 5V x2 24V 15 5V x2 24V 15 5V x2 24V Over Voltage Reconnect 15V x2 24V 15V x2 24V 15V x2 24V Equaliz...

Страница 29: ...float and low voltage disconnect voltage Environmental Parameters Environmental Parameter Ambient temperature range 35 to 55 Storage temperature range 35 to 80 Humidity range 10 90 NC Enclosure IP30...

Страница 30: ...r 1210RN 1 Solar Module MPP Voltage 17V Nominal System Voltage 12V 2 Solar Module MPP Voltage 34V Nominal System Voltage 12V 92 0 92 5 93 0 93 5 94 0 94 5 95 0 95 5 96 0 10 20 30 40 50 60 70 80 90 100...

Страница 31: ...ltage 12V 4 Solar Module MPP Voltage 34V Nominal System Voltage 24V 81 0 83 0 85 0 87 0 89 0 91 0 93 0 95 0 10 20 30 40 50 60 70 80 90 100 110 120 130 93 5 94 0 94 5 95 0 95 5 96 0 96 5 97 0 97 5 20 4...

Страница 32: ...5 Solar Module MPP Voltage 68V Nominal System Voltage 24V 88 0 89 0 90 0 91 0 92 0 93 0 94 0 95 0 96 0 97 0 20 40 60 80 100 120 140 160 180 200 220 240 260 W...

Страница 33: ...Tracer Dimensions mm Tracer 1206RN 1210RN 1215RN...

Отзывы: