EPS eSoft Pro Скачать руководство пользователя страница 3

Controller Features

While in the service position, pressing the “Next” button will toggle between the time, current flow rate in 

litres and the capacity remaining. Press and hold “Regen” to force an immediate regeneration. When the 
valve is regenerating, it will show a countdown clock for each stage. Press “Regen” once to skip stages. 

Warranty

This product is guaranteed for the period of one year from the date of purchase against mechanical and/

or electrical defects. This guarantee is only valid if the unit has been installed and used in accordance these 

instructions. 

Fig 1

Fig 2

Fig 3

Fig 4

Fig 5

Fig 6

Fig 7

Programming your water softener

To connect the power cable you need to firstly remove the cover, then 

remove the drive bracket assembly by pressing up on the drive brackets 

release tabs and pulling towards you. (Fig 1)  

Feed the cable through the back plate (Fig 2) and connect to PC  

board (Fig 3). Its important that the bracket is reapplied with a loud snap to 

ensure the gears meet the drive gear. 

Press “Set Clock” button, hours will flash.  

Use up and down buttons to set hours. 

Press “Next” button, set minutes and press “Next”.

Press “Next” and “Up” buttons together and hold until screen changes.

Set hardness based on raw water hardness of water supply.

Press “Next”. Leave next setting at 2 - 0.

Press “Next”. Set the day override (preset at 4).

Press “Next”. Set the regeneration time (preset at 2am).

1.

2.

3.

4.

5.

6.

7.

8.

Commissioning your water softener 

With the softener now programmed, press & hold “Regen” until the motor 

begins to turn. When the motor stops, the screen will appear as in Fig 4. 

Now, open the inlet valve slowly to allow the softener fill with water. At this 

point water will discharge to the drain and purge any air from the system. 

Manually fill the internal salt tank with 10 litres of water. When the air is 

purged from the system, press “REGEN” once to advance to the next cycle, 

the screen will appear as in Fig 5. The system is now drawing water from the 

internal tank ans slowly discharging to the drain. . Take the time to observe 

the water level dropping (which happens very slowly). This is vital as it 

ensures the system can regenerate and operate correctly. If the system will 

not draw water from the internal tank ensure the fittings are tight and re-do 

steps 1 & 2.  

Press “REGEN” once, when the motor stops, the screen will appear as in  

Fig 6. Monitor this cycle for a moment to ensure water flows well to drain. 

Press “REGEN” once, when the motor stops, the screen will appear as in  

Fig 7. At this point the system is refilling the internal salt tank. Take a 

moment to ensure the water level rises suffieciently. 

Press “REGEN” once, when the motor stops it the system is in HOME position 

and ready to offer softened water. 

Fill the unit with salt. Monitor the salt level on a regular basis & fill if required.

1.

2.

3.

4.

5.

6.

Содержание eSoft Pro

Страница 1: ...Water Softener Installation Manual ...

Страница 2: ...e Its recommended to install the overflow 2 3 inches below the salt lid of the cabinet Introduction Thank you for purchasing your eSoft Water Softener The Clack CI valve with which your water softener is fitted has been selected to provide the best efficiency performance possible Only attempt this installation if you have been trained on the installation of water softeners Packing List Your water ...

Страница 3: ...t the day override preset at 4 Press Next Set the regeneration time preset at 2am 1 2 3 4 5 6 7 8 Commissioning your water softener With the softener now programmed press hold Regen until the motor begins to turn When the motor stops the screen will appear as in Fig 4 Now open the inlet valve slowly to allow the softener fill with water At this point water will discharge to the drain and purge any...

Страница 4: ...Certified Valve Up to 4 people Volumetric Water Softener Intelligent Controls 10L Cabinet Water Softener by eS ft PRO 1 Pressure Reducing Valve Raw water sample point Inlet pressure Bypass Backwash water pipe minimum Drain with air gap Treated water sample point Outlet pressure 2 3 4 5 6 Recommended extra bypass 7 assembly for servicing Pre Filter eSoft PRO 10L By EPS Assembly Installation C M Y C...

Страница 5: ...0mm 240mm 350mm Maximum working pressure 5 bar 5 bar 5 bar 5 bar Minimum working pressure 1 7 bar 1 7 bar 1 7 bar 1 7 bar Service flow rate 10L min 10L min 15L min 23L min Pressure drop at service flow 0 2 bar 0 2 bar 0 35 bar 0 55 bar Resin Volume 5 litres 8 litres 20 litres 30 litres Minimum supply flow rate 5L min 8L min 8L min 8L min Salt use per regeneration 0 75 kgs 1 2 kgs 3 0 kgs 4 5 kgs I...

Отзывы: