![Epoch Design Gabriel 5169 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/epoch-design/gabriel-5169/gabriel-5169_instructions_2418080003.webp)
Have a question? Need a part ASAP? Call 1-800-589-7990 or email [email protected].
The Gabriel Loft Bed can be
assembled as a left ladder
configuration with a few
alterations in assembly, shown
in steps 10 & 11.
RIGHT
LEFT
PLEASE NOTE: The Gabriel Loft Bed directions are for a right side ladder configuration.
LEDGE
A
A
B
C
To assemble the upper section of the Full Loft Bed, attach the two upper
end boards A to the loft side rails. The rails B and C used on upper loft have
four pre-drilled holes on the side of each rail for safety rail attachment
(See Figure
I
).
I
1
Unroll the slat bundle H out on the loft
distributed evenly strap side down.
Using a Phillips head screw
driver and 30mm slat screws
secure the first slat on one end,
then the final slat on the other
end making sure the slats have
been distributed evenly.
Then secure the remaining slats to the rails.
**NOTE: A power screwdriver set on low comes in handy here.
3
Attach the two long safety rails E to the upright
supports G using eight 40mm bolts.
Notice that the two long safety rails
have threaded inserts to connect
to the 40mm bolts. Please note that
the head of the threaded inserts face
away from the 40mm bolts as shown
(See Diagram
III
).
Tighten with hex key.
4
To install the center support, insert 80mm bolts
through the upper end boards into the barrel nuts in
the center support.
2
Insert barrel nuts
into side rails.
Insert 100mm
bolts through
end boards.
Tighten 100mm
bolts with hex key.
The rear side rail has a
groove lengthwise that
should face down.
C
Groove
Pre-drilled holes
A
D
H
E
E
E
E
G
G
G
III
1
2
3
4
14-Aug-2018
3/5