CONTROL BOX SPECIFICATIONS 

 

Extraneous light / advanced ignition 

During the pre-purging and/or pre-starting phase there 
shall be no flame signal. Should the signal be present, for 
example for advanced ignition due to bad tightness of the 
electrovalve, external lighting, short-circuit in the photo-
resistance or in the connecting cable, a breakdown in the 
flame signal amplifier, and so on., when the pre-purging 
and safety time has elapsed, the control-box brings the 
burner to the emergency stop and cuts off fuel inflow even 
during the safety time. 

No flame 

If there is no flame at the end of the safety time, the control-
box stops the burner immediately. 

No flame during operation 

If there is no flame during operation, the control-box cuts 
off fuel and automatically repeats a new starting program: 
once the “t4” time has elapsed, the starting program is 
over. 
Every safety stop of less than 1 second switches off voltage 
to terminals 3 - 8 - 11: and to terminal 10, it is possible to 
provide a remote signal of emergency stop. Resetting of 
the control-box is possible after approx. 50 seconds of 
emergency stop. 

 

Program Legend 

Control-box output signals 
Input signals required 

A’  Beginning of starting cycle for burners 

with light-oil pre-heater “OH” 

A  Beginning of starting cycle for burner 

without light-oil pre-heater 

B Flame presence 
C  Normal operation 
D  Adjustment stop by “R” 

tw Light-oil pre-heating time until operation consent 

by contact “OW” (minimum thermostat) 

t1  Pre-purging time 
t3  Pre-starting time 
t2  Safety time 
t3n Post-starting time 
t4  Time interval between flame presence and 

connection of 2nd valve to terminal 5 

 

Tension Type  Safety 

at 

 

Pre-purging 

Pre-starting 

Safety 

Post-starting 

Time

 low voltage 

  time 

Interval

V ~ 

t1 

t3 

t2max 

t3n 

BV1-BV2=t4

220/240         LOA 24.171 B27 

YES 

13 s 

13 s 

 10 s 

15 s 

15 s

PREPARATIONS FOR START UP 

Make sure that the return pipe in the tank has no obstructions, e.g. gate valves, closed plugs etc. Any eventual 
obstruction would cause a breakage in the sealing surface situated on the pump shaft. Close the main switch 
and the boiler thermostats in order to start up the motor and the ignition transformer. Upon completion of the 
pre-ventilation time, the solenoid valve is activated. The electrovalve will cut in and expose the photocell to a 
source of light until the burner stops (lock-out). When the pipelines have been filled up (and when fuel has come out 
of the nozzle), stop the burner and put the photocell back in its seat. 

NOTE: 

Should it be necessary to purge air, this can be done by loosening the special fitting which the pump is 

provided with. 

Do not illuminate 

the photocell before the electric valve has cut in because, in this case, the 

control box will go to “lock-out”. 

 

- 10 - 

Содержание RINOX 35

Страница 1: ...Instruction for ligth oil burner models Edition 2006 05 RiNOx35...

Страница 2: ...ration is not valid with regard to EC or U NI Standards for gas burners or the gas part of duel fuel burners gas light oil or gas heavy oil when such burners have been ordered in non compliance with t...

Страница 3: ...and leaves the equipment make sure that the booklet always goes with the equipment so it can be consulted by the new owner and or installer For all equipment with optionals or kits including electric...

Страница 4: ...regulations since incorrect installation may cause damage to person animals or things for which damage the manufacturer cannot be held responsible Before installation it is advisable to carry out car...

Страница 5: ...0 Fuel Maximum Viscosity light oil 5 5 cst 20o C Electrical Supply 1 230V 10 50Hz Motor kW 0 11 Pre heater W 60 Transformer 30 mA 2x10kV Absorbed Electical Power kW 0 260 Weight Kg 12 Operations ON OF...

Страница 6: ...r Disk Head Positioning 6 Combustion Head 7 Disk Head Adjusting Screw 8 Photocell 9 Electrovalve 10 Light Oil Pump 11 Motor 12 Burner Connection Flange 13 Insulating Gasket OVERAL DIMENSIONS A A1 A2 B...

Страница 7: ...WORKING FIELD 7...

Страница 8: ...rs Total meters i 10 mm i 12 mm 0 5 26 54 1 24 47 1 5 18 38 2 14 30 2 5 10 23 3 6 15 3 5 7 HYDRAULIC CONNECTIONS The pipes that connect the tank to the burner should be in perfect tight condition we r...

Страница 9: ...rom the lower side or the left side of the burner APPLICATION OF THE BURNER TO THE BOILER WITH SLIDING FLANGE Fasten flange B to the boiler with n 4 screws D placing the insulation card E Insert burne...

Страница 10: ...tarting cycle for burner without light oil pre heater B Flame presence C Normal operation D Adjustment stop by R tw Light oil pre heating time until operation consent by contact OW minimum thermostat...

Страница 11: ...for proper ignition The burner is equipped with an on nozzle light oil heater This device provides better atomisation and thus better combustion After having installed the nozzle check the correct pos...

Страница 12: ...accordance with the demands of the particular boiler type RECOMMENDEDNOZZLES STEINES type S 60 MONARCH type R 60 DAN FOSS type S 60 Most components can be inspected by removing the hood To inspect th...

Страница 13: ...C AE 47C 1387 1 ELECTROVALVE USUALLY CLOSED 2 PRESSURE TEST POINT AND PURGE POINT 1 8 3 PRESSURE REGULATION SCREW 4 RETURN 5 SUCTION 6 DELIVERY TO NOZZLE 7 VACUUM TEST POINT 1 8 N B The pump is preset...

Страница 14: ...ating in the opposite direction as that indicated by the arrow 1 Check the feeder line 2 Repair or replace it 3 Check the suction pipe 4 Fill with fuel 5 Open it 6 Replace nozzle 7 Invert a phase in t...

Страница 15: ...t is advisable to make all the connections with flexible electric wire Conductor s minimum section 1 5 mm2 15 L1 PHASE N NEUTRAL GROUND H0 Block Lamp H1 Operation Light FR Photocell TA Ignition Transf...

Страница 16: ...20 24 20 95 21 63 22 30 22 95 23 57 24 19 24 78 4 50 5 00 15 90 17 00 18 03 19 00 19 93 20 82 21 67 22 48 23 27 24 04 24 78 25 49 26 19 26 87 27 54 5 00 5 50 17 49 18 70 19 83 20 90 21 92 22 90 23 83...

Страница 17: ...EOGB Energy Products Ltd 5 Howard Road Eaton Socon St Neots Cambs PE19 8ET Telephone 08703 899499 Facsimile 01480 477022 Website www eogb co uk 197506...

Отзывы: