Before proceeding with installation ensure all operating & dimensional specifications are suitable for the intended installation.
1.1 INSTALLATION COMPLIANCE REQUIREMENTS
Enware product’s must be installed in accordance with
AS/NZS 3500.1 & AS/NZS3500.2 – Plumbing and Drainage,
the Plumbing Code of Australia as well as imposed Local and
State / Territory Legislative requirements and the manufacturers
instructions.
The following clauses must be observed for a compliant installation
and correct operation of Enware tapware:
Water Services
Plumbing Code of Australia:
Part B1 Cold Water Services
AS / NZS 3500.1-2003 Water Services;
• Section 3.3.2 Pressure at outlets (min 200kPa is required for
valve to operate)
• Section 3.3.4 Max. pressure within buildings (500kPa
operating)
• Section 3.4 Velocity Requirement (Max 3.0m/s)
• Section 16 Testing and Commissioning; Flushing,
Hydrostatic testing, cleaning & disinfection of water services.
NOTE: Enware’s WC flushing units have Watermark License to
ATS5200.020 (For Flushing Valves for Water Closets and Urinals -
For use with Mains Supply), ATS5200.030 (Solenoid Valves) and
WELS registered to AS/NZS 6400
IMPORTANT TECHNICAL REQUIREMENTS
To ensure that the unit works correctly, it is important to ensure that
the site and location of installation meets the hydraulic requirements
of AS/NZS 3500.1. Also there must be:
• Minimum 20mm copper supply line for 1 stall or up to
450mm wall space. 600mm of wall space may require
25mm supply
• Minimum 200kPa for valve to operate
NOTE: WELS Flush Volume only achieved at 350kPa
• No more than 1 valve per urinal OR 600mm wall space
• Flush valve must be no more than 2m above ground level
• Flush valve should be installed min 300mm above wall
hung urinal and 450mm above continuous wall urinals
Pipe work to the valve fixture must be sized according to water
service rule calculations and simultaneous demand requirements.
To ensure that the pipeline reticulation system for the valve is
designed correctly for the satisfactory performance of the valve
a Hydraulic services Consultant and/or Engineer (or other
personnel appropriately qualified in hydraulic services design) must
be engaged.
1.2 INSTALLATION INSTRUCTIONS
1. Separate parts from packaging & check each part
(figure 2.1). Parts will separate as shown in figure 1.2. Pay
attention to the different models variations. Make sure all parts
are accounted for before discarding any packaging material.
If any parts are missing, do not attempt to install your flushing
system until missing parts are obtained.
2. Flush water supply lines thoroughly before installing the flush
valve. Do not allow dirt, Teflon tape or metal particles to enter the
unit.
3. Shut off water supply and ensure shut off valve is closed
on flushing system.
4. Decide on appropriate location combining piezo operation and
valve placement. Install height of between 1-1.5m recommended
for piezo placement.
5. Cut a 30mm hole in the wall for piezo assembly and an
appropriate gap in pipe work in which to fix the valve.
(FIGURE 1.1)
Note
:
Note
: 20mm (min) inlet pipe with 1/2” BSP (male) adaptor
required for install.
Note
: piezo can be installed away from valve box where
necessary, i.e. flush valve in wall cavity with activation on different
wall. Extensions can be purchased if required. AS3500.1
requirements are still required to be met.
6. Connect the shut off valve and upper section of the union (as
shown) (FIGURE 1.2 and 1.3)
FIGURE 1.2
FIGURE 1.3
UPPER
SECTION OF
FLUSH VALVE
LOWER
SECTION OF
FLUSH VALVE
SPARGE
CONNECTION
(ADAPTOR OR AIR
GAP)
FIGURE 1.1
Ø30
INSTALLATION INSTRUCTIONS