
22
Call 1300 369 273
www.enware.com.au
SERVICING THE MIXER
STRAINERS, CHECK VALVES AND HOB MOUNT O-RINGS
ATM
606/607 MODELS
1. Ensure both Hot and Cold water supplies have been
isolated by turning both Isolation valves 90 degrees to
‘OFF’ position - refer to
IMAGES 56
(page 21). Open
mixer to ensure water supplies have been isolated
correctly and no water flows from outlet prior to servicing
mixer. Remove basin Body as per instructions on previous
page.
2. Using an M6 allen key, unscrew hot and cold inlet fittings
to gain access to the internal cavities within basin mount
SEE IMAGE 62
.
3. Once removed, check sealing O-rings for damage or
debris and replace if needed.
4. Remove strainers from within cavity
SEE
IMAGE 63
.
Strainers should be cleaned with a diluted de-scaling
solvent (such as CLR), checked for physical damage and
thoroughly rinsed with clean water.
5. The check valves are located within both the hot and cold
inlet fittings
SEE IMAGE 64
Using circlip pliers, remove
circlips from both fittings
6. Using a small allen key, gently push out check valves.
The Check Valves should be cleaned with a dilute water
solution of suitable de-scaling solvent (such as CLR),
checked for physical damage and then thoroughly rinsed
with clean water.
7. The Hob Mount O-rings are found around the base of the
Hob mount. While the Mixer body is removed from Basin
Mount, it is possible to check these O-rings for damage
or debris. Additionally it is possible to check that the Hot
inlet Fitting O-ring and Central mount O-ring for damage.
SEE
IMAGE 65
8. Re-fit strainers and inlet fittings, ensuring the taller ‘HOT’
inlet fitting is screwed into the correct Hot supply cavity
SEE
IMAGE 62
.
9.
Check each fittings location within hob mount
corresponds to Hot and Cold markings on base of hob
mount SEE PAGE 5 & 6 for details for ATM606/607
models.
10. Re-fit mixer body over Basin mount, ensuring O-rings
do not pinch or get caught on isolation valve access
cavity. Using M5 allen key, thread in basin mount fixing
screw, until the basin body is firm against the basin top -
ensuring both O-rings are correctly positioned and lightly
greased.
11. When service is complete, slowly open the cold water
isolation valve and inspect mixer body for leaks. Repeat
with Hot water isolation valves. Open mixer by rotating
handle anti clockwise and check operation and flow.
12. Commence commissioning as per instructions on page 19.
IMAGE 62
COLD SIDE
INLET FITTING
HOT SIDE
INLET FITTING
IMAGE 63
IMAGE 64
IMAGE 65
Ensure all O-rings are slightly greased
before re-fitting basin body.
Ensure fittings are wound down flat
against hob mount
Содержание AQUABLEND SQX ATM606
Страница 28: ......