COMMISSIONING

All maintenance and building works should be complete before commissioning this MEV unit. 

This will avoid any major disturbance to the installation or high volumes of dust or debris being 

drawn into the system. Do not commission the MEV unit until it is fully installed including power, 

ductwork, internal valves and external vents.

MEV systems must be commissioned in accordance with Approved Document F of the Building 

Regulations for England and Wales. Further good practice and advice for the installation of MEV 

systems can be found in the latest edition of the Domestic Ventilation Compliance Guide for 

England and Wales. For MEV commissioning guidance in other countries, please refer to the 

relevant local Building Regulations for that country.

• 

Determine the required ventilation rates. For guidance see Approved Document F of the 

building regulations for England and Wales.

• 

Press the SET button for 4 seconds to enter commissioning mode. (Humidity sensor input is 

disabled temporarily while the unit is in commissioning mode).

• 

LEDs B, C and D will light and LED A will flash, indicating that the extract boost flow rate is 

being modified.

• 

Fully open all extract valves then measure the air flow rate at all system extract points using 

a calibrated air flow meter capable of measuring in l/s or m

3

/hr.

• 

Add the extract rates from all rooms together, then compare this value to the calculated 

whole building (boost) extract ventilation rate.

• 

Use the + and - buttons to increase or decrease the flow rate in order to meet the calculated 

whole building extract ventilation rate. (See Approved Document F). When maximum speed 

setting is reached, the LED will flash fast. When the minimum speed setting is reached, the 

LED will flash slowly.

• 

Now adjust the individual valves to extract at the appropriate rate for each wet room. (Once 

this step has been completed it may be necessary to adjust the unit boost rate again to 

account for any increase in pressure). Then lock the valves in position.

• 

Press the SET button once to move on to the extract trickle flow rate. LEDs A, C and D will 

light and LED B will flash indicating that the extract trickle flow rate is being modified.

• 

Again use the + and - buttons to increase or decrease the flow rate in order to meet the 

calculated whole building (trickle) ventilation rate. (See approved document F).

• 

When commissioning is complete for the boost and trickle flow rates, press SET for 4 

seconds to return to normal running mode. The unit will automatically return to normal 

running mode after 60 minutes of inactivity.

Содержание MEV 160

Страница 1: ...MEV 160 MEV 300 INSTALLATION GUIDE AFTER INSTALLATION THE END USER SHOULD KEEP THIS GUIDE FOR FUTURE REFERENCE DO NOT THROW AWAY...

Страница 2: ...ng and user maintenance must not be performed by children ELECTRICAL CONNECTION All wiring must comply with Building Regulations and the current IET Wiring Regulations BS7671 in the UK or equivalent s...

Страница 3: ...unning mode In this configuration a suitable triple pole isolator must be used in line with the local wiring Standard units can be connected to the supplied hard wired boost switch via the black two c...

Страница 4: ...CONTROLS ACCESS AREA COVER SCREWS ACCESS AREA 150 COVER SCREWS ACCESS AREA 150 150 INTERNAL ACCESS for cleaning or maintenance DIMENSIONS 1 Isolate the unit from the mains power supply 2 Undo all fou...

Страница 5: ...4 AFTER INSTALLING THIS UNIT PLEASE PASS ONTO END USER DO NOT THROW AWAY CONTROL PANEL To access the control panel unclip the cap using a small flat head screwdriver DIAGRAMS...

Страница 6: ...tiple locations The MEV 160 unit is capable of delivering a maximum airflow of 75 l s 270 m3 hr and a maximum system pressure of 573Pa The MEV 300 unit is capable of delivering a maximum airflow of 10...

Страница 7: ...cks 125mm duct or 75 90mm fast track 3 Screws 8g x 2 0 4 Wall plugs 4 Foam pads 4 Rubber bushings 4 M5 Washers 4 PRE INSTALLATION CHECKLIST Does the unit and ductwork fit in the space where it will be...

Страница 8: ...ound the front cover and then use a flat head screwdriver to lift the three clips along the edge of the unit Now gently pull the cover away from the unit 3 Select up to 3 of the extract spigot locatio...

Страница 9: ...r either 125mm duct or the 90mm Fast Track duct system 6 Use the unit as a guide to mark the four main corner fixing holes Four alternative fixing points are shown in the diagram These can be used if...

Страница 10: ...should be fitted in accordance with the Domestic Ventilation Compliance Guide and follow any system designs that have been produced for the property Ductwork through unheated spaces needs to be insul...

Страница 11: ...to provide control over the fan speed Connect it to the terminal block at the end of the black cable labelled 0 10V control input inside the unit The cable should enter the unit through the notch in t...

Страница 12: ...flow rate is being modified Fully open all extract valves then measure the air flow rate at all system extract points using a calibrated air flow meter capable of measuring in l s or m3 hr Add the ext...

Страница 13: ...is returned to the off position To deactivate the boost function Move the switch to the off position The unit will return to its normal running mode WIRELESS REMOTE CONTROL WIRELESS UNITS To manually...

Страница 14: ...emove the rear casing The battery is located behind the front cover The remote control requires 1x CR2032 battery Replace the battery ensuring the correct polarity then replace the rear cover and scre...

Страница 15: ...CAL SPECIFICATION Extract spigot diameter 125mm or 75 90mm Fast Track Exhaust spigot diameter 125mm MEV160 Maximum air flow rate 75l s MEV300 Maximum air flow rate 103l s MEV160 Maximum power consumpt...

Страница 16: ...tenance Air flow rates have been commissioned with a calibrated anemometer or other suitable piece of equipment to meet Approved Document F of the Building Regulations for England Wales Commissioning...

Страница 17: ...rom the mains power supply Undo all four screws around the front cover and then use a flat head screwdriver to lift the three clips along the edge of the unit Now gently pull the cover away from the u...

Страница 18: ...e made for a member of our team to visit call out charges may apply SUPPLY ONLY If your product has been supplied by EnviroVent and installed by a third party it is covered by a two year parts only wa...

Страница 19: ...and appearance without notice We want to hear from you Your feedback is important to us as we strive to improve our products services and overall customer experience Please email us to help us serve y...

Отзывы: