background image

E/ONE PLC 

QUADPLEX PANEL 

Installation and  

Operation Manual 

For Hardwired Pumps 

Environment One Corporation 

 

 

 

Содержание E/One PLC

Страница 1: ...E ONE PLC QUADPLEX PANEL Installation and Operation Manual For Hardwired Pumps Environment One Corporation...

Страница 2: ...on 10 7 3 Audible Alarm Manual Silence 10 7 4 Pump Performance 10 7 4 1 Hour Meter RUNTIME 10 7 4 2 Cycle Counter CYCLES 10 7 4 3 Last Cycle Runtime LAST s 11 7 4 4 Minimum Runtime MIN RUN s 11 7 4 5...

Страница 3: ...The E One PLC Quadplex Panel displays pump status operating parameters and user options by means of the following indicators Touch Screen Interface to show Pump Panel operating conditions provide for...

Страница 4: ...larm History Trouble Reset Menu Main Menu Pump 1 Data 1 Pump 2 Data 1 Pump 3 Data 1 Pump 4 Data 1 Pump 1 Data 2 Pump 2 Data 2 Pump 3 Data 2 Pump 4 Data 2 2 E One PLC Quadplex Menu Flowchart Refer to s...

Страница 5: ...e The panel is properly installed and started by following the steps below 1 Mount and wire the panel per the instructions on the enclosure door 2 Ensure that Pressure transducer in the station is set...

Страница 6: ...main menu allow the user to access all of the functionality of the touch screen interface 5 2 Pump Data Menu The Pump Data menu allows the user to view pages of data for each pump Each pump menu has t...

Страница 7: ...left will return the user to the Main Menu The Clear Trouble Button will open a menu where you can clear any trouble conditions preventing a pump from running This is especially useful for troublesho...

Страница 8: ...een and the user can access the cold start and factory default options from this menu In order to use these functions the buttons must be held for at least 3 seconds this is to prevent accidental dele...

Страница 9: ...ting it is not advised unless directed by E One service personnel as changing this limit will affect how the overpressure protection feature performs Doing so without proper guidance may void the prod...

Страница 10: ...el Alarm Operation A High Level Alarm is initiated if the liquid level in the tank reaches the high level as determined by the Pressure Transducer or backup high level float If a High Level is detecte...

Страница 11: ...ot saved through power loss 7 4 9 Average Amps AVG AMPS A The average Amperage reading represents the average amperage draw the motor has experienced while running since the last reset This value is d...

Страница 12: ...second lockout period begins and the cycle will repeat During the first three lockout periods the panel alarm light will be lit If after the third lockout period 60 minutes the condition has not been...

Страница 13: ...t operation Overpressure Excessive pump pressure Discharge valve closed check valve malfunction line restriction grinder restriction bad motor Remove pump from discharge and retest with no discharge p...

Страница 14: ...vervoltage Overpressure etc panel contactor not functioning panel contactor mis wired faulty PLC set points not properly entered Verify contactors are open when pumps not called to run by PLC Manual r...

Страница 15: ...15 NA0702P01 REV A 12 03 2019 12 Appendix 12 1 Typical Field Wiring Diagram...

Страница 16: ...limit set under the Run Limit setting BLOCKED LINE indicates that all pumps are locked out due to overpressure conditions P1 2 3 4 FAILED TO START indicates that a pump failed to start when called to...

Страница 17: ...17 NA0702P01 REV A 12 03 2019 Environment One Corporation 2773 Balltown Road Niskayuna New York 12309 1090 Voice 01 518 346 6161 Fax 518 346 6188 www eone com A Precision Castparts Company...

Отзывы: