envea ProGap 2.0-BS Скачать руководство пользователя страница 13

13

Open: 0 V
Closed: Ub - 0.7 V

Closed: Ub - 0.7 V

Open: Ub
Closed: 0.7 V

Closed: 0.7 V

Open Collector

Open Collector

11. Impuls output

R = (Ub - 0.7 V)/l

Содержание ProGap 2.0-BS

Страница 1: ...INSTRUCTIONS ProGap 2 0 BS Ex LEVEL DETECTION WITH FILLING STREAM DETECTION ENVEA SWR engineering Gutedelstra e 31 79418 Schliengen GERMANY Tel 49 0 7635 827248 0 info swr envea global www swr engine...

Страница 2: ...equipment 5 4 3 Sensor installation 5 4 4 Mounting of the Evaluation unit 6 5 Use in hazardous areas 7 6 Electrical connection 8 6 1 Electrical connection of sender 8 6 2 Electrical connection of rece...

Страница 3: ...onductive materials such as plastics are able to penetrate it can be used for detection from outside or through a window In this way the measurement can be fully decoupled from the process to measure...

Страница 4: ...ctly may result in death or injury Attention This symbol is used in the operating manual to denote actions which may result in danger to property 3 3 Operational safety The microwave barrier may only...

Страница 5: ...t the sensor socket is free of dirt and deposits If the measuring point is not installed directly the sensor socket can be closed with a cover with G 1 thread It must be strictly ensured that the send...

Страница 6: ...nd shielded A minimum cross section of 0 75 mm2 should be maintained For distances longer than 100 m the cross section should be adjusted to 1 5 mm2 118 35 90 90 23 Fig 4 Dimensions of evaluation unit...

Страница 7: ...ufacturer s instructions and applicable standards 3 Do not operate the device outside the electrical and thermal parameters 4 Mount the housing cover and cable entries properly to ensure the housing p...

Страница 8: ...ender 6 1 Electrical connection of sender 1 Power supply 0 V 2 Power supply 24 V S1 Dip switch for setting the material flow monitoring Hi Lo Fig 8 Electrical connection of receiver 6 2 Electrical con...

Страница 9: ...te If the sensors are installed correctly commissioning can be started via the 7 segment display on the evaluation unit 7 2 Menu description The 7 segment display is deactivated in normal operation On...

Страница 10: ...High delay maximum 10 sec Status LED P1 Flashes in relation to the response delay the switch on and off time of the LED corresponds to the actual delay time 6 Switching response of relay DP LED lights...

Страница 11: ...et the switch off delay of the relay and open collector output can be set at menu item 5 In menu items 6 7 it is then necessary to select the desired switching response for the relay and open collecto...

Страница 12: ...In case of distances below 400 mm we recommend rotating the sender or receiver by 90 The pipe where the measuring point is installed must be earthed 10 Default settings If the and buttons are pressed...

Страница 13: ...13 Open 0 V Closed Ub 0 7 V Closed Ub 0 7 V Open Ub Closed 0 7 V Closed 0 7 V Open Collector Open Collector 11 Impuls output R Ub 0 7 V l...

Страница 14: ...Ex Housing L 155 mm 60 mm thread L 30 mm G 1 Cable gland M16 5 10 mm Weight of ProGap 2 0 BS Approx 560 g Weight of ProGap 2 0 BS Ex Approx 880 g Evaluation unit Supply voltage 24 V DC 10 Power consum...

Отзывы: