envea ProGap 2.0-BS Скачать руководство пользователя страница 11

11

7.4  Start-up procedure

The following points should be checked before the initial start-up: 

 

Correct installation of the measuring point

 

Correct alignment of the polarisation

 

Correct connection between the sensors and evaluation unit

 

Heat-up time of at least five minutes 

The parameters are set via the 7-segment display for optimal measuring value output. It must first be ensured 
that the receiver detects the signal from the sender. For this, the beam path between the units must be free 
and menu items 3 + 4 set so that LED P1 lights up (no material detection).
Once it is ensured that the sender and receiver are detecting, the settings for the motion detection can 
be made in menu 1 + 2. The motion detection is performed during the process and must be set so that 
the current material is detected in the process (LED P1 lights up). After the motion detection is set, we 
recommend checking again whether the receiver detects the signal from the sender during the process 
(Menu 3+4, LED P1 lights up). 
The microwave barrier must then be interrupted completely with the material to be measured. Once the 
beam path is interrupted, it is necessary to check at menu items 3 + 4 that LED P1 has switched off (material 
detection).
Once the process parameters are set, the switch-off delay of the relay and open collector output can be set at 
menu item 5. In menu items 6 + 7, it is then necessary to select the desired switching response for the relay 
and open collector output. For a better overview, the status LED P1 can be assigned to the state of the relay 
contact or the open collector at menu item 8. 

The open collector output must be supplied actively with a voltage (max. 30 V, 20 mA).

Once all parameters are set properly, these must be saved by pressing the + button at menu item 9.

The initial start-up is now completed, allowing the ProGap 2.0-BS to alarm reliably as soon as  

the selected limit level is reached. 

8.  Error signalling

Error

Cause

Action

Relay contact does not switch 
when filling level is reached

Low bulk density of material

Set microwave barrier for 

sensitivity

Set motion detection as 

insensitive

Check installation situation, 
change if necessary

Low DK value of material

Sender and receiver do not see 

each other

Polarisation distorted

Display of an “

S

” on the 

7-segment display

Sender unit was not detected

Check electrical connection; 
Contact ENVEA -  

SWR engineering

Display of an “

E

” on the 

7-segment display

Receiver unit was not detected

Check electrical connection;
Contact ENVEA -  

SWR engineering

Display of a “

P

” on the 

7-segment display

Parameter saving failed

Perform start-up again and save 

parameters again

If several errors are active, these are shown sequentially on the 7-segment display. 

Содержание ProGap 2.0-BS

Страница 1: ...INSTRUCTIONS ProGap 2 0 BS Ex LEVEL DETECTION WITH FILLING STREAM DETECTION ENVEA SWR engineering Gutedelstra e 31 79418 Schliengen GERMANY Tel 49 0 7635 827248 0 info swr envea global www swr engine...

Страница 2: ...equipment 5 4 3 Sensor installation 5 4 4 Mounting of the Evaluation unit 6 5 Use in hazardous areas 7 6 Electrical connection 8 6 1 Electrical connection of sender 8 6 2 Electrical connection of rece...

Страница 3: ...onductive materials such as plastics are able to penetrate it can be used for detection from outside or through a window In this way the measurement can be fully decoupled from the process to measure...

Страница 4: ...ctly may result in death or injury Attention This symbol is used in the operating manual to denote actions which may result in danger to property 3 3 Operational safety The microwave barrier may only...

Страница 5: ...t the sensor socket is free of dirt and deposits If the measuring point is not installed directly the sensor socket can be closed with a cover with G 1 thread It must be strictly ensured that the send...

Страница 6: ...nd shielded A minimum cross section of 0 75 mm2 should be maintained For distances longer than 100 m the cross section should be adjusted to 1 5 mm2 118 35 90 90 23 Fig 4 Dimensions of evaluation unit...

Страница 7: ...ufacturer s instructions and applicable standards 3 Do not operate the device outside the electrical and thermal parameters 4 Mount the housing cover and cable entries properly to ensure the housing p...

Страница 8: ...ender 6 1 Electrical connection of sender 1 Power supply 0 V 2 Power supply 24 V S1 Dip switch for setting the material flow monitoring Hi Lo Fig 8 Electrical connection of receiver 6 2 Electrical con...

Страница 9: ...te If the sensors are installed correctly commissioning can be started via the 7 segment display on the evaluation unit 7 2 Menu description The 7 segment display is deactivated in normal operation On...

Страница 10: ...High delay maximum 10 sec Status LED P1 Flashes in relation to the response delay the switch on and off time of the LED corresponds to the actual delay time 6 Switching response of relay DP LED lights...

Страница 11: ...et the switch off delay of the relay and open collector output can be set at menu item 5 In menu items 6 7 it is then necessary to select the desired switching response for the relay and open collecto...

Страница 12: ...In case of distances below 400 mm we recommend rotating the sender or receiver by 90 The pipe where the measuring point is installed must be earthed 10 Default settings If the and buttons are pressed...

Страница 13: ...13 Open 0 V Closed Ub 0 7 V Closed Ub 0 7 V Open Ub Closed 0 7 V Closed 0 7 V Open Collector Open Collector 11 Impuls output R Ub 0 7 V l...

Страница 14: ...Ex Housing L 155 mm 60 mm thread L 30 mm G 1 Cable gland M16 5 10 mm Weight of ProGap 2 0 BS Approx 560 g Weight of ProGap 2 0 BS Ex Approx 880 g Evaluation unit Supply voltage 24 V DC 10 Power consum...

Отзывы: