
Mounting the SSA
2-8 Installation
2.
Attach
a
mounting
bracket,
included
in
the
SSA
rail
kit,
to
the
outside
of
each
rail
using
the
6
‐
32
screws
removed
in
step
1.
See
.
Use
four
6
‐
32
screws
to
attach
each
mounting
bracket.
Leave
the
6
‐
32
screws
loose
to
position
the
mounting
brackets
properly
against
the
rack
posts.
Figure 2-4 Attaching the Mounting Brackets to the Rails (Left Rail Example)
3.
Position
the
right
and
left
rails,
which
are
labeled
on
the
inside
of
each
rail,
in
the
rack
with
the
bottom
lip
of
the
rail
facing
into
the
rack.
The
front
mounting
ears
of
the
rails
should
be
flush
against
the
front
screw
holes
of
the
rack
posts.
The
mounting
brackets
should
be
flush
against
the
rear
screw
holes
of
the
rack
posts.
See
Figure 2-5 Positioning and Attaching the Rails to the 7-inch Posts
1
Mounting bracket
2
Rail
1
Securing the left rail to the front of the 7-inch
post
2
Securing the left mounting bracket to the rear of
the 7-inch post
Содержание SSA-G1018-0652
Страница 2: ......
Страница 12: ...x ...
Страница 16: ...xiv ...
Страница 20: ...Getting Help xviii About This Guide ...
Страница 46: ...Completing the Installation Pin Out Descriptions 2 22 Installation ...
Страница 64: ...Using the OFFLINE RESET Button 3 18 Troubleshooting ...
Страница 68: ...Regulatory Compliance A 4 Specifications ...
Страница 76: ...Management of PoE Power to PDs C 4 About PoE Power over Ethernet ...