4-Post Rack Mount Installation
Enterasys 7100G-Series Hardware Installation Guide
C-5
4-Post Rack Mount Installation
The rack mount option kit supports the flush mount configuration for a 4-post rack installation,
with the option of recessing the chassis a maximum of 1.5 inches. Both air flow directions are
supported.
on page C-5 displays the 4-post rack flush mount configuration for both air flow
directions. The recessed chassis configurations (configured when installing the adapter plates, see
“
” on page C-4) are not displayed.
Figure C-3
Four Post Rack Supported Configurations
This section details the installation of the optional rack mount kit for a 4-post rack and covers
installing:
•
The rack mount rail and extension assembly to the rack
•
The 7100G-Series chassis to the rack mount rail and extension assembly
The optional rack mount kit contains two pre-assembled rack mount rails with attached
extensions. The length of each assembly is adjustable from 22 inches to 30 inches. Each assembly is
labeled either “right front” or “left front”. The front of the rack is always the cool air intake side.
The rear of the rack is always the hot air exhaust side.
1
Adapter plate (ear side)
3
Recess mount adapter plate screw holes (1.5 in.)
2
Flush mount adapter plate screw hole
4
Air flow direction
1
Flush mount, switch I/O port side to power supply side air flow
4
Hot air exhaust side
2
Flush mount, power supply side to switch I/O port side air flow
5
Air flow direction
3
Cool air intake side
Содержание 7100G Series
Страница 2: ......
Страница 12: ...x...
Страница 20: ...Getting Help xviii About This Guide...
Страница 46: ...Completing the Installation Pin Out Descriptions 2 22 Installation...
Страница 58: ...Using the OFFLINE RESET Button 3 12 Troubleshooting...
Страница 62: ...Regulatory Compliance A 4 Specifications...
Страница 84: ...Management of PoE Power to PDs D 4 About PoE Power over Ethernet...