
Required Order of Installation
Enterasys 7100G-Series Hardware Installation Guide
C-3
Required Order of Installation
1.
Remove the rack mount ears from the chassis
2.
Attach the adapter plates to the chassis
3.
Install the rail assemblies in either a four post rack (see “
4-Post Rack Mount Installation
page C-5) or a two post rack (see “
2-Post Rack Mount Installation
4.
Install the chassis in the rack.
Removing the Rack Mount Ears from the 7100G-Series Chassis
Remove the rack mount ears from both sides of the 7100G-Series chassis before continuing with
the mounting kit installation. See
Figure C-1
Removing the 7100G-Series Chassis Rack Mount Ears
The removed rack mount ears and screws are not used in any mounting kit installation
procedures.
Installing the Adapter Plates
Two adapter plates come with the mounting kit. Adapter plates are used to secure the chassis to:
•
The rail and extension assemblies used in the 4-post rack configuration (see “
with Attached Extension Assembly Installation
•
The rail and mid-bracket assemblies used in the 2-post rack configuration (see “
•
The adapter plates can be installed in either a flush or a recessed configuration of up to 1.5
inch.
1
Rack mount ear
2
Rack mount ear screws
Содержание 7100G Series
Страница 2: ......
Страница 12: ...x...
Страница 20: ...Getting Help xviii About This Guide...
Страница 46: ...Completing the Installation Pin Out Descriptions 2 22 Installation...
Страница 58: ...Using the OFFLINE RESET Button 3 12 Troubleshooting...
Страница 62: ...Regulatory Compliance A 4 Specifications...
Страница 84: ...Management of PoE Power to PDs D 4 About PoE Power over Ethernet...