Mounting the 7100G-Series Switch
Enterasys 7100G-Series Hardware Installation Guide
2-3
Mounting the 7100G-Series
Switch
To install the 7100G-Series switch in a rack using the 71A-RACK-U optional rack mount kit, follow
the pre-installation discussion here including: “
Power Supply Air Flow and Switch Fan Module
Reversing the Fan Module Air Flow
” on page 2-5, before proceeding
Optional Rack Mount Rail Kit Installation
You can install a 7100G-Series switch on a flat surface or in a rack. For more information about flat
surface installation, see “
There are four possible rack mounting configurations as shown in
, based upon
whether:
•
The switch I/O ports side or the power supply side of the device face front
•
The device is mounted flush with the rack posts or mid-mounted
Figure 2-1
7100G-Series Switch Rack Configurations
Note:
The 7100G-Series switch comes with integrated mounting ears that are adequate for most
installations. For slide-in mounting, high vibration, or high shock installations, an optional rack
mount kit (71A-RACK-U) is available.
1
Flush mounted with the switch I/O ports facing
3
Mid-mounted with the switch I/O ports facing front
front (cool air side)
4
Mid-mounting with the power supply facing front
2
Flush mounted with the power supply facing
5
Air flow direction
front (cool air side)
Содержание 7100G Series
Страница 2: ......
Страница 12: ...x...
Страница 20: ...Getting Help xviii About This Guide...
Страница 46: ...Completing the Installation Pin Out Descriptions 2 22 Installation...
Страница 58: ...Using the OFFLINE RESET Button 3 12 Troubleshooting...
Страница 62: ...Regulatory Compliance A 4 Specifications...
Страница 84: ...Management of PoE Power to PDs D 4 About PoE Power over Ethernet...