
Mounting the 7100G-Series Switch
Enterasys 7100G-Series Hardware Installation Guide
2-5
Reversing the Fan Module Air Flow
Removing the Fan Module
To remove the switch fan module:
1.
Unscrew the two fan module captive screws as shown in
2.
Slide the fan module forward until it is unplugged from the device.
Figure 2-2
Removing the Switch Fan Module
71A-PS-B
DS460S-3-002
From switch I/O port side to
power supply side
71A-POE-A
N/A
From power supply side to
switch I/O port side
N/A
71A-POE-B
N/A
From switch I/O port side to
power supply side
N/A
Table 2-3
71A-PS-A/B Power Supply Air Flow Based on Model Number (continued)
Model Number
Mfg. Part Number
Air Flow Direction
Serial Number Label
Note:
If the 7100-Series switch rack configuration requires the air flow to be from the switch I/O port
side to the power supply side, the air flow in the switch fan modules must be reversed for the switch
fan module.
1
Fan module captive screws
3
Fan module connector
2
Switch Fan module
4
Fan unit metal plate
Содержание 7100G Series
Страница 2: ......
Страница 12: ...x...
Страница 20: ...Getting Help xviii About This Guide...
Страница 46: ...Completing the Installation Pin Out Descriptions 2 22 Installation...
Страница 58: ...Using the OFFLINE RESET Button 3 12 Troubleshooting...
Страница 62: ...Regulatory Compliance A 4 Specifications...
Страница 84: ...Management of PoE Power to PDs D 4 About PoE Power over Ethernet...