background image

 
 

RAK107 

 

22.5.2018 


 

1.2

 

Abbreviations 

Abbreviation 
in English 

Description 

A/D-board 

Analog to Digital board. Used to convert 
HDMI etc. video signal to LVDS for the 
panel 

HDMI 

High Definition Multimedia Interface, 
video signal cabling standard 

RCD 

Residual Current Device, protecting 
humans from electric shock 

RFID 

Radio Frequency Identification, 
information remote reading/writing 
system, here used to identify authorized 
charging point users 

LED 

Light Emitted Diode  

LVDS 

Low Voltage Differential Signaling. 
Standard used for video signal cabling. 

MCB 

Master Circuit Breaker, also sometimes 
Miniature Circuit Breaker, protects 
cables from over load and short circuits 

OCPP 

Open Charge Point Protocol, protocol 
how the charger is communication with 
backend systems 

PCB 

Printed Circuit Board 

TFT-LCD 

Thin Film Transistor, Liquid Crystal 
Display. A panel technology widely used 
in information display products 

 

 

 

Содержание Chago Media

Страница 1: ...Chago Media Installation instructions Operation instructions...

Страница 2: ...3 Opening the package and handling the product 10 3 4 Concrete base stand 11 3 5 Installation procedure 12 4 Commissioning 14 4 1 Pillar s electrical centre 14 4 2 Charger door opening 15 4 3 Display...

Страница 3: ...n 27 8 Charging Point Maintenance Preventive Maintenance Instructions 29 9 Display Maintenance 30 9 1 Maintenance tasks after 50 000 70 000 operating hours30 9 2 Scheduled maintenance once a year 30 9...

Страница 4: ...RAK107 22 5 2018 4...

Страница 5: ...The display must be handled carefully like any other piece of glass Any mechanical shocks blows drops and stress should be avoided DANGER Take extra caution to handle live display as there is electri...

Страница 6: ...ation remote reading writing system here used to identify authorized charging point users LED Light Emitted Diode LVDS Low Voltage Differential Signaling Standard used for video signal cabling MCB Mas...

Страница 7: ...107 22 5 2018 7 2 Overview of the product The display structure consists of 46 Display unit two charging points and electrical centre Picture 1 View of the display including pillar from front and behi...

Страница 8: ...These are used to adjust tilting angle to level the display Cables are run through the concrete base into display s pillar structure and then into electrical centre display housing 3 1 Setting up inst...

Страница 9: ...uts So appropriate spanner should be used Display s charging points are opened using torx tool and display housing is opened with triangle key Electrical installation tools are needed to make the requ...

Страница 10: ...nd twisting Do not remove the product away from the delivery package before installation Opening the transportation package 1 Set the package to a suitable place for handling 2 Remove package covers a...

Страница 11: ...vided drawings please see chapter 13 Concrete base should include channel for cable bushing and bolts pre fitted into cast for display fixation Alignment nuts are inserted to each bolt These are to op...

Страница 12: ...to help installation 1 Check and set lifting slings into place on top of the display if not already present 2 Remove cover plate from back using triangle key check next page 3 Insert hoist harness to...

Страница 13: ...RAK107 22 5 2018 13 Picture 3 Back cover removal using triangle key Picture 4 Display on concrete base without back cover...

Страница 14: ...s withdrawn into display pillar commissioning may commence 4 1 Pillar s electrical centre Carry three phase feed into the plastic box via cable grommet and connect into terminal blocks Picture 5 Main...

Страница 15: ...g doors there are hinges supporting opening of them 4 3 Display s door and panel opening To enter display s component both the door and the TFT LCD panel must be opened They have hinge system to ease...

Страница 16: ...FT LCD element a bit to open it will open 89 6 When closing the case release the locking mechanism of the telescopic support by moving all the way open 7 Close the TFT LCD element with wide screwdrive...

Страница 17: ...RAK107 22 5 2018 17 Picture 7 Door s and TFT LCD element s locks and open close directions...

Страница 18: ...4 4 Media display controller board installation Controller board will be installed into the display s component plate There are terminal blocks for 230VAC operating voltage available to be used Video...

Страница 19: ...10 HDMI cable connected to A D board and 230VAC connection terminal blocks 5 Display s operational functions Following paragraph describes and shortly covers functionality of each topics Each topic co...

Страница 20: ...RAK107 22 5 2018 20 Picture 11 Display s inside...

Страница 21: ...t over high current 6A C curvature Filter F11 EMC filter Terminal blocks from far right PE N L Operating voltage input for the display system Terminal blocks in the middle PE N 1 230VAC interface for...

Страница 22: ...g element Works autonomously Set to 15 C Thermostat K2 Blue Normally open thermostat to control cooling fans Works autonomously Set to 35 C 5 4 Diagnostic board Diagnostic board 95IPD Monitors tempera...

Страница 23: ...07 22 5 2018 23 5 5 A D board and keyboard A D board 95VGA13 Provides video signal to TFT LCD panel Connection via HDMI alternatively DVI DP Controlling keyboard available for image adjustment paramet...

Страница 24: ...thermostat K1 Operates using 230VAC 5 7 Fans Circulation fans M1 M5 These fans operate 24 7 to circulate small air current inside the display Cooling fans M2 M3 M4 M6 These fans cool the display if to...

Страница 25: ...table RFID read user login ongoing Green Flashing User login fail access denied Red Stable User login passed charging allowed Green Waving While connecting the cable Green Flashing twice Vehicle conne...

Страница 26: ...user permission to charge If the user login is failed the indicator light turnstored Iftheuserloginispassed theindicator light turns to waving green Now you are logged in to the charging station Plug...

Страница 27: ...ng any actions Note Only trained electrician may perform the installation in accordance with the applicable local and national electrical rules and standards 7 3 Checking the Installation Go through t...

Страница 28: ...ersupplycables L1 L2 L3 N andPE are properly connected Insulationofpowersupplycablesis intact L1 L2 L3 N and PE Voltage between PE and N is less than 10 V PE quality is less than 3 Operational check A...

Страница 29: ...to ensure no bad contact connec tion exist wire or PCB Gently push the controller to create vibration to ensure no bad contact connection exist wire or PCB Create fail and charge with RFID card to ch...

Страница 30: ...changed after 70 000 operating hours The circulation fans are always on when the display is powered on The cooling fans are controlled by the thermostat and are in use only when the inner temperature...

Страница 31: ...cal inspection once a year or so Perform the following mechanical inspection every year or more often depending of the environmental impurities 1 Clean the display housing and the front glass with moi...

Страница 32: ...hatch cover back on Then proceed to the next hatch and repeat process Heat exhanger channel and hatches Open hatch and cooling fan in cover 9 6 Changing the display s components 9 6 1 TFT LCD element...

Страница 33: ...ment by first removing the telescope support and then removing securing nuts from the sides 5 Insert new TFT LCD element and fix into plate 6 Reinsert A D board OSD keyboard and other cabling to the T...

Страница 34: ...housing and between the front glass and TFT LCD element Fans are located inside the display at left side and heat exchanger channel includes one In order to change a fan the whole fan plate must be re...

Страница 35: ...to access fan plate See chapter 7 2 1 4 Remove fan power cabling coming from the fan plate to terminal blocks 5 Remove the fan plate from the display 6 Replace broken fan and install fan plate back i...

Страница 36: ...h back to plate so that fan s blow direction is as it were 5 Re connect fan s wiring 6 Power on the display with the main switch Q1 7 Test the functionality of the fan by adjusting the thermostat valu...

Страница 37: ...value for the K2 is 35 C degrees The red thermostat K1 is opening type and the blue thermostat K2 is closing type How to change a thermostat 1 Open the display s front door and TFT LCD element 2 Power...

Страница 38: ...ply 1 Open the display s front door and TFT LCD element 2 Power off the display from the main switch Q1 3 Disconnect the power supply s cables and remove the power supply 4 Insert a new power supply i...

Страница 39: ...2 Power off the display from the main switch Q1 3 Disconnect the A D board s cables and remove fixation nuts 4 Change new board into place 5 Secure fixation nuts and reconnect cables 6 Power on the d...

Страница 40: ...alled to a mounting plate that has snap on connection to DIN rail How to change the 95IPD diagnostic board 1 Open the display s front door and TFT LCD element 2 Power off the display from the main swi...

Страница 41: ...RAK107 22 5 2018 41 Diagnostic board 95IPD...

Страница 42: ...rred while power is on Option 1 If equipped with Mode 3 lock release functionality turn off the power from F0 and pull charging cable out from the socket Option 2 Turnoffthepower Switch Mode3lock manu...

Страница 43: ...ower supply Staticcurrentlimitation Supply connections and terminals L1 L2 L3 N PE Cu 2 5 50 mm Al 6 50 mm Tightening torque Nm 4 Nm 2 5 4 mm 12 Nm 6 50 mm Design and mechanics Material color Painteds...

Страница 44: ...l Standalone mode Default Free use Online mode Option RFIDreader ISO IEC1443A B Option Remotecontrol throughcommunication interfaces Energy measurement Default Current transformers per charging point...

Страница 45: ...wer outage Default Surge overvoltage protection Option Low control voltage 12 VDC Default Connectivity and Communication Connectivity Default GSM 3G Option Ethernet Communication Default OCPP 1 5 or O...

Страница 46: ...Display Troubleshooting Inspection list 1 Please see the wiring diagram for the connections 2 Check the 230 VAC power supply 3 Check that the display fuses are ok 4 Check the 24 VDC power supply 12 1...

Страница 47: ...RAK107 22 5 2018 47 12 2 TFT LCD panel failure...

Страница 48: ...RAK107 22 5 2018 48 13 Concrete installation drawing...

Страница 49: ...RAK107 22 5 2018 49 14 Charging point wiring diagram...

Отзывы: