Commissioning
Once display has been securely installed onto concrete base and
cables withdrawn into display pillar commissioning may commence.
4.1
Pillar’s electrical centre
Carry three-phase feed into the plastic box via cable grommet and
connect into terminal blocks.
Picture 5
Main power cable feed into pillar’s electrical centre
L1 = Phase
L2 = Phase
L3 = Phase
N = Neutral
PE = Protective earth
Содержание Chago Media
Страница 1: ...Chago Media Installation instructions Operation instructions...
Страница 4: ...RAK107 22 5 2018 4...
Страница 17: ...RAK107 22 5 2018 17 Picture 7 Door s and TFT LCD element s locks and open close directions...
Страница 20: ...RAK107 22 5 2018 20 Picture 11 Display s inside...
Страница 41: ...RAK107 22 5 2018 41 Diagnostic board 95IPD...
Страница 47: ...RAK107 22 5 2018 47 12 2 TFT LCD panel failure...
Страница 48: ...RAK107 22 5 2018 48 13 Concrete installation drawing...
Страница 49: ...RAK107 22 5 2018 49 14 Charging point wiring diagram...