11
RAK93 / © Ensto 2018
Dimension Drawing
432
363
200
220
168
495
140
1500
EVH020.01 / EVH020.02 / EVH050.02
EVH020.01R / EVH020.01R16 and EVH020.02R / EVH020.02R16 /EVH050.02R16
Страница 1: ...RAK 93 18 5 2018 Ensto 2018 Chago eFill ENG Installation instructions Operation instructions...
Страница 2: ...EVH050 02R16 3 EVH020 01 and EVH020 02 EVH050 02 4 Supply Connection EVH020 01 and EVH020 02 EVH050 02 5 Charging Current Limitation 7 Top Cover Installation 8 Plug Holder Installation 8 User Instruct...
Страница 3: ...ed Ratchet wrench set Torx key set Power drill with bore bit Screws and possible accessories for wall installation Before Installation Remove the eFill from it s package Do not to scratch the surface...
Страница 4: ...t match charging current setting in eFill See table on page 7 When the light turns green the charging point is ready for use EVH020 01 and EVH020 02 EVH050 02 NOTE The installation must be done by a q...
Страница 5: ...EVH020 01 and EVH020 02 EVH050 02 NOTE The installation must be done by a qualified person e g an electrician The supply cable routing must be proper Ensure the sufficient supply cable sizes in the i...
Страница 6: ...N L1 PE PP X1 16A L2 L3 1 2 3 4 EVH020 01 EVH020 02 SUPPLY 1 x 16A 230V max 6mm Cu 30mA RCD and 16A MCB SUPPLY 1 x 16A 230V max 6mm Cu 30mA RCD and 16A MCB PG ProximityGround CP ControlPilot PG Proxi...
Страница 7: ...ging current OFF OFF OFF OFF OFF OFF 6A ON OFF OFF OFF OFF OFF 8A EVH020 01R EVH020 02R default OFF ON OFF OFF OFF OFF 10A ON ON OFF OFF OFF OFF 12A OFF OFF ON OFF OFF OFF 14A ON OFF ON OFF OFF OFF 16...
Страница 8: ...ng point is ready to use for charging Plug Holder Installation Install the plug holder to a wall so that the plug is handy to pick up and the placement is practical com pared to location of the parked...
Страница 9: ...oint No light Troubleshooting The vehicle is not charging Ensure that the charging cable is properly connected to the vehicle Ensure from the vehicle that the vehicle has no timer charging activated I...
Страница 10: ...ll the order num ber V You will find the order number on the nameplate on the enclosure bottom Maintenance Instructions With well done maintenance you can ensure a long lifetime of the charging point...
Страница 11: ...11 RAK93 Ensto 2018 Dimension Drawing 432 363 200 220 168 495 140 432 363 220 200 168 1500 EVH020 01 EVH020 02 EVH050 02 EVH020 01R EVH020 01R16 and EVH020 02R EVH020 02R16 EVH050 02R16...
Страница 12: ...gconnectors 1 Chargingcurrentmax 16A1 phase 3x16A 3 phase 8A1 phase 16A1 phase 3x16A3 phase Chargingoutput 3 6kW 11kW 3 6kW 11kW Nominalvoltage 230V1 phase 230V 400V 3 phase 230V1 phase 230V 400V 3 ph...