background image

 

 

© 2019 Enphase Energy Inc.

 

17 

Troubleshooting  

The following sections describe possible problems and solutions.  

 

During installation, use the Enphase Installer Toolkit mobile app to verify AC Battery operation. The Installer 

Toolkit, when used with Envoy-S provides information about the AC Battery status, PV production, and home 

energy consumption. 

 

LED is Rapidly Flashing Yellow or Not Lit 

If, after starting up, the AC Battery LED rapidly 

flashes yellow or is not lit, check that the proper 

voltage (230V line-to-neutral) is provided to the AC 

Battery. To do this:  

 

Remove the access cover on the bottom 

of the battery.  

 

Check whether both the AC and DC 

connectors are fully seated in the 

receptacles.   

 

Unplug the AC connector and test the 

voltage and frequency at the terminals of 

the junction box. You should detect 

approximately 230V/50Hz between the 

blue and white terminals and 

approximately 230V between the blue and 

green terminals.   

 

Battery Information is Incorrect or Absent in Installer Toolkit or Enlighten 

The Envoy-S manages the charging and discharging of the AC Battery. Ensure that the Envoy-S current 

transformers (CTs) are correctly installed and that production and consumption metering are configured 

correctly in Installer Toolkit. Once this is done, you can use Installer Toolkit to check that the Envoy-S has 

detected the connected devices and that they are communicating.  

Check the Internet Connection 

If you do not see AC Battery information in Enlighten, check whether the Envoy-S and the Internet connection 

are working.  

 

Run a Device Scan 

If needed, you can also provision devices either by scanning the AC Battery(ies) bar code(s) or by performing 

a device scan. If the AC Battery(ies) cannot be detected by the device scan or if the AC Battery(ies) are not 

communicating, you need to relocate the Envoy-S to be closer to the AC Battery(ies). This is because the 

Envoy-S communicates with the AC Battery using power line communications. The Envoy-S and AC 

Battery(ies) must be installed on the same phase. 

Relocate the Envoy 

When possible, locate the Envoy-S within 20 meters or 65 feet (electrically) from the AC batteries. This may 

not always be practical since the Envoy-S must also be connected to the production and consumption CTs 

that are installed around the main service and solar production circuits. If so, you can extend the CT leads as 

Bottom view (access panel removed) 

Содержание IQ7-B1200-LN-I-INT01-RV0

Страница 1: ...INSTALLATION MANUAL 2019 03 141 00037 Rev 01 Enphase AC Battery IQ7 B1200 LN I INT01 RV0 ...

Страница 2: ... refer to enphase com licenses For Enphase patent information refer to enphase com company patents Product information is subject to change without notice All trademarks are recognised as the property of their respective owners For warranty text refer to enphase com en uk warranties User documentation is updated frequently Check the Enphase website enphase com en uk support solar professionals for...

Страница 3: ...LED Overview 16 Troubleshooting 17 LED is Rapidly Flashing Yellow or Not Lit 17 Battery Information is Incorrect or Absent in Installer Toolkit or Enlighten 17 Check the Internet Connection 17 Run a Device Scan 17 Relocate the Envoy 17 Ensure that Meters are Properly Configured 18 Ensure that the Grid Profile and Rate Tariff are Set 18 Enable Charging From and Discharging To the Grid 18 Battery LE...

Страница 4: ...rrange a replacement If not let the area dry completely before use In case of unusual noise smell or smoke Ensure that nothing is in contact with the AC Battery or in the venting area on top of the AC Battery Ventilate the room Contact Enphase Customer Support at enphase com global support contact Safety Instructions IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS This guide contains importa...

Страница 5: ...n hearing distance or close enough to come to your aid when you work with or near electrical equipment WARNINGS Risk of property or equipment damage Do not use the CAN port on the AC Battery It is intended to be used by Enphase technicians only Install the AC Battery only on a structurally suitable wall using an Enphase wall mount bracket Before installing or using the AC Battery read all instruct...

Страница 6: ...ation of the AC Battery Earlier versions of the Enphase Envoy communications gateway and the Envoy S Standard gateway are incompatible The Enphase AC Battery is intended to operate with an Internet connection Failure to maintain an Internet connection may have an impact on the warranty See enphase com en uk warranties for full terms and services When replacing an Enphase AC Battery you must replac...

Страница 7: ...data from all Enphase Microinverters at the site over on site AC power lines and forwards that data to Enlighten via the Internet for statistical reporting and system control The Enphase Envoy S Metered communications gateway with properly installed production and consumption CTs is required for operation of the AC Battery When used with non Enphase PV systems the Envoy S can collect production an...

Страница 8: ...ion CT s and consumption CT s installed and configured as described in the Enphase Envoy S Metered Quick Install Guide When used with Enphase devices the Envoy S can control grid management functions and monitor PV production and site consumption When used with non Enphase PV systems it can collect production and consumption data but it does not control grid management functions of non Enphase PV ...

Страница 9: ...ive equipment PPE for handling lithium ion batteries as required by local safety standards c Ensure that you have the following optional items if needed 20A maximum AC isolator Conduit and fittings Stud finder d Install the PV system and the Envoy S as directed by the installation manuals e To record the location s of the AC Battery ies peel the removable serial number label from each battery and ...

Страница 10: ...e battery ies away from falling or moving objects including motor vehicles WARNING If mounted in the direct path of a motor vehicle we recommend a 36 inch minimum 91 cm mounting height d Ensure that there are no pipes or electrical wires where you plan to drill e Plan to maintain at least 300 mm one foot of clearance in front of each battery f Consider the dimensions of the AC Battery easy access ...

Страница 11: ...WARNING Multiple risks Make sure not to drill or attach into electric wiring or pipes that are in the wall d Place the wall mount bracket on the wall so that the mark on the bracket aligns with the centre of the stud Use a level to keep the top of the wall mount bracket flat and attach each corner of the wall mount bracket using one screw and washer for each slot e Verify that the wall mount brack...

Страница 12: ...e branch circuit under load 20 A maximum b Connect one side of the isolator to the switchboard load centre c Verify that AC voltage at the site is within range Single phase L1 Active to N must measure between 200 and 270 VAC WARNING Risk of equipment failure Size the conductor gauge to account for voltage rise for both the branch circuit and all upstream conductors leading back to the PCC point of...

Страница 13: ...corresponding conductor Line Neutral and Earth Each push terminal accepts two 2 5mm2 to 4mm2 conductors 11mm strip length For each use a screw driver to depress and open the terminal then insert the stripped conductor d After all wires in the junction box are connected and secured check that there are no exposed conductors e If connecting additional AC batteries use another conduit and set of wire...

Страница 14: ...ount bracket ensure that the four tabs on the AC Battery are inserted into their corresponding openings in the wall mount bracket After the tabs are inserted begin lowering the AC Battery slowly to ensure that the tabs have latched onto the wall mount bracket WARNING Risk of injury and equipment damage Do not release the AC Battery until you ensure that all four tabs have safely latched onto the w...

Страница 15: ...two compression half turn latches using a 4mm Allen key 6 Energise and Commission the System WARNING Before energizing the system check to ensure that ALL of the AC batteries in the system are properly installed and conductors terminated a Check to ensure that the AC Battery bottom access plates on all AC batteries in the system are closed and secured b Switch on the circuit feeding the AC Battery...

Страница 16: ...atteries are fully discharged then they must recharge before they can discharge again LED Overview The LED flashes yellow while the AC Battery boots up If the LED rapidly flashes green for more than two minutes the battery is in trickle charge mode and will remain so until it reaches a minimum state of charge up to 30 minutes After the AC Battery boots up the LED glows blue or green depending on t...

Страница 17: ...nvoy S current transformers CTs are correctly installed and that production and consumption metering are configured correctly in Installer Toolkit Once this is done you can use Installer Toolkit to check that the Envoy S has detected the connected devices and that they are communicating Check the Internet Connection If you do not see AC Battery information in Enlighten check whether the Envoy S an...

Страница 18: ...on AC Battery charging increases the consumption reading Since a portion of the PV production is used to charge the batteries the home s consumption will appear to increase during charging When the batteries are discharging the consumption metering reports the load consumption lower than actual If any of these checks show incorrect results check the Envoy S and CT wiring against the appropriate wi...

Страница 19: ...registers a high temperature event it responds by reducing operation to correct internal temperature System Alert AC Battery ies with Critical Temperature Check the temperature in the room and increase cooling and or ventilation as required to meet temperature requirements The AC Battery requires an ambient temperature between 20 C and 45 C and where relative humidity is between 5 and 95 percent C...

Страница 20: ...o high nor too low for storage or transport Once Sleep Mode is initiated the AC Battery will continue to operate until it reaches the desired charge Since the rate at which the AC Battery can charge or discharge is governed by the loads connected at the point of coupling it can take several hours to get to the desired charge Therefore Enphase recommends that you initiate Sleep Mode 24 48 hours in ...

Страница 21: ...stem at the main switchboard 11 If an Enphase Customer Support has authorised an AC Battery replacement RMA follow the instructions provided by Enphase Customer Support for arranging the collection and transportation of the AC Battery Re installing the AC Battery If you have temporarily removed one or more AC batteries and placed them in Sleep Mode perform the following steps to place each AC Batt...

Страница 22: ...e device from the Envoy S database 3 Add the new AC Battery serial number to the Envoy database by initiating a device scan using one of the following methods Method 1 Initiate a scan using the Installer Toolkit mobile app In Installer Toolkit once connected to the Envoy navigate to the Overview screen From the Overview screen under AC batteries tap Detected Start Device Scan to start a new 30 min...

Страница 23: ...oy S The Envoy S begins a 15 minute scan to identify all of the devices deployed at the site The Device Communications LED flashes green during the scan 4 Log in to Enlighten to use Enlighten s Array Builder to add the newly detected device to the virtual array Device Communications LED Device Scan button ...

Страница 24: ...cations TUV Rheinland Roundtrip cell efficiency1 96 Mechanical Data Dimensions 390 mm W x 325 mm H x 220 mm D without bracket Weight 23 kg Installation Wall mounted in an indoor space using standard AC wiring in conduit or in wall where allowed Enclosure Indoor IP20 Cooling Natural convection No active or passive cooling infrastructure required Grid configuration TN C S Features and Compliance Com...

Отзывы: