Install the Enphase 

Encharge Storage System

To install the Enphase

 

Encharge 3

™ storage system or 

Encharge 10

™ storage system and the Enphase wall-mount bracket, read and follow all warnings and 

instructions in this guide. Safety warnings are listed on the back of this guide. These instructions are not meant to be a complete explanation of how to design 

and install an energy storage system. All installations must comply with national and local electrical codes and standards. 

Only qualified electricians shall 

install, troubleshoot, or replace the Encharge 3 or Encharge 10.
The Encharge

 storage system includes the Enphase Encharge Battery(ies) with integrated Enphase IQ

™ 

Microinverters. The Enphase IQ Envoy™ commu-

nication gateway measures PV production and home energy consumption. The Encharge storage system senses when it is optimal to charge or discharge 

the battery so that energy is stored when it is abundant and used when scarce. Encharge storage systems are capable of providing backup power when an 

Enphase Enpower

 smart switch is installed at the site.

Five unique installation  

scenarios are shown:

Enlighten Cloud
Tertiary control, API interface, 

over-the-air firmware upgrade

WiFi/Cellular

Wireless

Power Line 

Communication

Encharge 10™/

Encharge 3™

storage system

Generator

(Future)

IQ 6™/IQ 7™

M

IQ™ Combiner

Enpower™

smart switch

Main 

Load Panel

Home Loads

Wireless

Enlighten Cloud
Tertiary control, API interface, 

over-the-air firmware upgrade

WiFi/Cellular

Wireless

Power Line 

Communication

Encharge 10™/

Encharge 3™

storage system

Generator

(Future)

IQ 6™/IQ 7™

M

IQ™ Combiner

Enpower™

smart switch

Home Loads

Main 

Load Panel

Wireless

Whole home backup with Enpower 

as service entrance and PV combiner 

connected to Enpower. 

This is the preferred 

configuration for back up of the entire main 

load panel. This configuration supports up 

to an 80A breaker for the PV circuit and an 

80A breaker for battery storage.

Whole home backup with Enpower 

as service entrance and PV combiner 

connected to main load panel. 

This is the 

preferred configuration when you back up 

the entire main load panel, and the size of 

the PV combiner circuit is more than 80A. In 

this configuration, the PV combiner circuit 

connection space in Enpower is left vacant. 

When existing PV combiner circuits are 

connected to the main load panel, and you 

want to add battery storage to the system, 

you can keep the PV combiner connected 

to the main load panel and connect only the 

battery storage system to Enpower.

Enlighten Cloud
Tertiary control, API interface, 

over-the-air firmware upgrade

WiFi/Cellular

Wireless

Main 

Load Panel

Power Line 

Communication

Encharge 10™/

Encharge 3™

storage system

Generator

(Future)

Other Loads

Backup Loads

Backup

Sub-Panel

IQ 6™/IQ 7™

M

IQ™ Combiner

Enpower™

smart switch

Wireless

Partial home backup with main load panel 

as service entrance and PV combiner 

connected to Enpower. 

When PV circuits 

breaker size is less than 80A, this is the 

preferred configuration for partial home 

backup with sub-panel.

© 2020 Enphase Energy. All rights reserved. Enphase, the Enphase logo, Enpower smart switch, Encharge storage system, IQ Envoy, IQ combiner, IQ microin-

verter, Installer Toolkit, Enlighten and other trademarks or service names are the trademarks of Enphase Energy, Inc. Data subject to change. 2020-03-25

P R 

E L 

I M

Содержание ENCHARGE Series

Страница 1: ... 10 Encharge 3 storage system Generator Future IQ 6 IQ 7 M IQ Combiner Enpower smart switch Home Loads Main Load Panel Wireless Whole home backup with Enpower as service entrance and PV combiner connected to Enpower This is the preferred configuration for back up of the entire main load panel This configuration supports up to an 80A breaker for the PV circuit and an 80A breaker for battery storage...

Страница 2: ... structural engineer and local standards for requirements Three 10 lag bolts or screws 7 6 cm 3 inches long depending on attachment wall for each single wide wall mount bracket Nine 10 lag bolts or screws 7 6 cm 3 inches long depending on attachment wall for each triple wide wall mount bracket Washers for use between fastener heads and wall mount bracket Copper conductors No 12 8 AWG 11mm 7 16 inc...

Страница 3: ...mbiner for grid tied only installations You must select proper conductors and AC discon nects for these circuits according to local codes standards and other applicable requirements Enpower supports up to a maximum of 80 A breaker for Encharge connection circuit The subpanel could be a small two circuit box with circuit breakers the drawing only shows switches The circuit breakers in the box would...

Страница 4: ... to the wall so that it is no more than five percent from vertical See the following image for reference Encharge 10 triple width bracket A Place the wall mount bracket on the wall so that the mounting holes in the middle of the bracket align with the center of the stud and the mounting holes on the left and right align with the adjacent studs B Use a level to keep the bottom of the wall mount bra...

Страница 5: ...Together lift the Encharge battery and bring it to the already mounted bracket G Hold the Encharge battery at an angle so the top of the unit sets into the top of the wall mount bracket WARNING Risk of injury and equipment damage Do not release the Encharge battery unit until you ensure that the Encharge battery unit is fully seated in the wall mount bracket shelf H Once the top of the battery is ...

Страница 6: ...onduit opening has a groove around the hole to fit the O ring red of the raceway Make sure that the O ring is captured in the groove between the Encharge enclosure and the raceway flange adjacent to the O ring 6 Install conduit and field wiring continued E Using the conductors and suitable conduits connect the AC disconnect and the first adjacent Encharge Battery Use the conduit openings provided ...

Страница 7: ...ol kit help topics for more information After the IQ Envoy has detected the Encharge Battery ies the Encharge LEDs operate as described in the following section CONFIGURE and ACTIVATE OPERATION a LED overview After being commissioned the LED flashes yellow while each Encharge Battery boots up If the LED rapidly flashes green for more than two minutes the battery is in trickle charge mode and will ...

Страница 8: ...ncharge Battery ies in storage ensure that AC power is not present and that the DC switch is in the Locked position While in storage damage to the battery can occur from over discharge If the battery state of charge falls to 0 the Encharge Battery ies can be damaged or destroyed Because of this the Encharge Battery ies must only be stored for a limited amount of time The Encharge Battery ies must ...

Отзывы: