background image

  I N S T A L L A T I O N   I N S T R U C T I O N 

Installing 

Enphase CT-100-SPLIT-ROW

The Enphase IQ Gateway uses a set of three 100A split core Current Transformers(CTs) each for production and consumption monitoring. They perform metering 

with an accuracy class of 1%. Read and follow all warnings and instructions in this instruction and in the Quick Install Guide included with your IQ Gateway and 

available at 

https://enphase.com/contact/support

INSTALLATION

For more information, see the reverse of 

this document for tips. Refer also to the 

 

IQ Gateway Quick Install Guide

.

Preparation

A )  If not already done, de-energize 

the home load panel and the PV 

system.

Installing the CTs for production monitoring

A )  Refer to the diagram on the reverse of this document for wiring.
B )  Locate the arrow on the CT label and make sure that the AC mains 

wire(s) are de-energized until you have secured the CT wires in the 

terminal blocks.

  To monitor production on Line 1

Connect the white wire to the “I1•” terminal and the blue wire to 

the “I1” terminal.

Clamp the CT on active Line 1 of the solar production circuit with 

the arrow pointing toward the load (away from the solar array). 

• 

To monitor production on Line 2

Connect the white wire to the “I2•” terminal and the blue wire to 

the “I2” terminal.

Clamp the CT on active Line 2 of the solar production circuit with 

the arrow pointing towards the load (away from the solar array). 

• 

To monitor production on Line 3

Connect the white wire to the “I3•” terminal and the blue wire to 

the “I3” terminal.

Clamp the CT on active Line 3 of the solar production circuit with 

the arrow pointing towards the load (away from the solar array. 

 

Tighten all connections to 0.56 Nm.

Install the consumption CTs

A )  Refer to the diagram on the reverse of this document for wiring.
B )  Install the 

consumption

 CTs on active phases as required:

• 

Locate the arrow on the CT label.

• 

Make sure that the AC mains wire(s) are de-energized until you 

have secured the CT wires in the terminal blocks.

  To monitor consumption on Line 1

Connect the white wire to the “I1•” and the “I1” to the blue “C1” 

terminal.

Clamp the CT on the main supply Line 1. When the consumption 

CT is on Line 1 conductor, the arrow must point toward the load 

(away from the grid). 

SAFETY

SAFETY AND ADVISORY SYMBOLS

+

DANGER

: This indicates a hazardous situation, which if not avoid-

ed, will result in death or serious injury.

NOTE

: This indicates information particularly important for opti-

mal system operation. Follow instructions carefully.

SAFETY INSTRUCTIONS

+

DANGER

: To reduce the risk of electric shock, always open or 

disconnect circuit from power-distribution system (or service) of 

building before installing or servicing current transformers.

+

DANGER

: Risk of electrocution! Do not install CTs when current 

flowing in the sensed circuit. Always install CT wires in the termi

-

nal blocks before energizing the sensed circuit.

+

DANGER

: If equipment is used in a manner not specified by 

Enphase Energy, the protection provided by the equipment may 

be impaired.

+

DANGER

: Risk of electric shock.  Be aware that installation of this 

equipment includes risk of electric shock. If you wire the IQ IQ 

Gateway the main load center before beginning wiring. If the sub-

panel cannot be de-energized, a qualified electrician may safely 

install the CTs as directed, making sure to connect the leads and 

then place the CTs around each wire and latch.

+

DANGER

: Risk of electric shock. Risk of fire. Only qualified per

-

sonnel should troubleshoot, install, or replace the CTs.

NOTE: 

Because of variance in switchboard design and main power 

feed, there may not always be enough space to install CTs.

NOTE

: Do not install the CTs in a switchboard where they exceed 

75% of the wiring space of any cross-sectional area within the 

equipment.

NOTE

: Perform all electrical installations in accordance with all 

national and local electrical codes.

NOTE: 

Restrict installation of current transformers in an area 

where they would block ventilation openings, or in area of breaker 

arc venting.

NOTE:

 Not suitable for Class 2 wiring methods and not intended 

for connection to Class 2 equipment.

NOTE: 

Secure current transformer and route conductors so that 

they do not directly contact live terminals or bus.

NOTE: 

When wiring the IQ Gateway for production and consump-

tion metering, be sure to install the current transformers (CTs) 

exactly as described for your application.

NOTE: 

When installing CTs, it is important to match CT and sense 

voltage phases. Be sure to consistently identify the two AC lines 

at three points: the main electrical panel feed, the IQ Gateway, 

and the PV production circuit breaker. Wire colors may not always 

consistently identify L1, L2 and L3. If in doubt, use a multimeter 

to check.

NOTE: 

Only run line conductors through the CT. The CT can 

monitor multiple active conductors. You may run more than one 

wire through the CT if all wires are on the same phase and they fit 

the opening in the CT.

NOTE: 

For indoor use only.

SPECIFICATIONS

SPECIFICATION

CT-100-SPLIT-ROW

CT type

Split core

CT accuracy (error rate) 

<1%

Maximum primary current

100A

Turns ratio

2500

Dimensions (in mm)

40.1 x 26.4 x 26.7

Aperture

9.8 mm diameter

Maximum conductor size support

16mm

2

 

CT lead wire length         

4m

Primary voltage

250VAC

Frequency

50-60Hz

Operating temperature

-40 to 85 degree C

Compliance

CE, RoHS compliant

Model: CT-100-SPLIT-ROW

Отзывы: