3. Please maintain a minimum of
4-inch clearance
on all sides of the unit to allow air to circulate while
giving access for the power cord.
Sealant Application
VERY IMPORTANT
: Please follow these steps during installation as they are very
important to ensure the sauna is properly installed.
1. Prepare before the installation and use similar sealant to prevent any leaks from
happening:
2. Apply sealant on the sides (as shown on the images) as well as on the bottom and
top of walls.
7
Содержание Diamond-3
Страница 28: ...Step 4 Place 2 full spectrum heaters on the front wall besides the door 31 ...
Страница 30: ...3 Timer Control reduce 7 Lights Button Pause 4 Timer Control increase 33 ...
Страница 38: ...OTHER ACCESSORIES Bucket with ladle Analog Thermostat Rocks Sand Timer Hourglass Clock Wall for Sauna 41 ...