![Enerzone Solution 2.3 Скачать руководство пользователя страница 56](http://html.mh-extra.com/html/enerzone/solution-2-3/solution-2-3_installation-and-operation-manual_2411801056.webp)
56
Destination 2.3 Installation and Operation Manual
Note that secondary air tubes (B) can be replaced without removing the baffle board (A).
Important Notes:
The air tubes are identified for placement as follows:
Model
Type of tube
Destination 2.3
Front
►
30 holes of 0.147"
Middle front
►
30 holes of 0.136’’
Middle rear
►
20 holes of 0.128’’
Rear
►
15 holes of 0.128’’
Содержание Solution 2.3
Страница 9: ...Destination 2 3 Installation and Operation Manual 9 ...
Страница 10: ...10 Destination 2 3 Installation and Operation Manual ...
Страница 33: ...Destination 2 3 Installation and Operation Manual 33 Clearances to combustible materials and floor protection ...
Страница 36: ...36 Destination 2 3 Installation and Operation Manual Clearances for shield construction ...
Страница 57: ...Destination 2 3 Installation and Operation Manual 57 Appendix 7 Exploded Diagram and Parts List ...