![Enerzone Solution 2.3 Скачать руководство пользователя страница 51](http://html.mh-extra.com/html/enerzone/solution-2-3/solution-2-3_installation-and-operation-manual_2411801051.webp)
Destination 2.3 Installation and Operation Manual
51
Appendix 3: Installing a Fresh Air Intake
This
stove is may be connected to a fresh air intake, sold separately.
Parts needed to complete the connection
are:
(A) – 4 1/2" TO 6 1/2"COLLAR. (2x)
(B) – AC02090, INSULATED FRESH AIR INTAKE PIPE (4' LENGTH / 5'' DIAMETER). (1x)
(C) – 5" WHITE INTAKE CAP. (1x)
You can purchase the above parts through your Enerzone dealer.
Содержание Solution 2.3
Страница 9: ...Destination 2 3 Installation and Operation Manual 9 ...
Страница 10: ...10 Destination 2 3 Installation and Operation Manual ...
Страница 33: ...Destination 2 3 Installation and Operation Manual 33 Clearances to combustible materials and floor protection ...
Страница 36: ...36 Destination 2 3 Installation and Operation Manual Clearances for shield construction ...
Страница 57: ...Destination 2 3 Installation and Operation Manual 57 Appendix 7 Exploded Diagram and Parts List ...