
28
Destination 2.3 Installation and Operation Manual
APPENDIX 3: INSTALLING THE OPTIONAL FRESH AIR INTAKE KIT
This
stove may be connected to a fresh air intake kit, sold separately.
Parts needed, but not included, to complete the connection
are:
(A) – 49030, COLLAR 4 1/2" A 6 1/2". (2x)
(B) – AC02090, INSULATED FRESH AIR INTAKE PIPE (4' LENGTH / 5'' DIAMETER). (1x)
(C) – 49028, 5" WHITE INTAKE CAP. (1x)
You can purchase the above parts through your Enerzone dealer.
Содержание EB00027
Страница 7: ...Destination 2 3 Installation and Operation Manual 7 ...
Страница 8: ...8 Destination 2 3 Installation and Operation Manual ...
Страница 22: ...22 Destination 2 3 Installation and Operation Manual Clearances to combustible materials and floor protection ...
Страница 33: ...Destination 2 3 Installation and Operation Manual 33 APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST ...