electrodes are correctly adjusted. The
for the gas quality to be used (see fi g.)
gauge to the test nipple Pa, see fi g.
been adjusted the pre-purging period
energized and opens and fl ame is
is fi nished.
air on stage 2 and just before the end
MEASURES AND CHECKS BEFORE START-UP
Inner assembly
Town gas
Inner assembly
Natural gas, LPG
Inner assembly
Biogas ((UV-detector)
LPG
Natural gas
172 205 18 12-01
45
°
Содержание Bentone BG 450 M
Страница 2: ......
Страница 6: ...TECHNICAL DATA DIMENSIONS OF FLANGE 172 215 19 08 01...
Страница 30: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...