www.enersys.com
NOTE:
The larger modules are too heavy to lift onto the shelves
manually. To avoid personal injury use appropriate
lifting devices when lifting modules onto the shelves.
4. Slide the module back into a safe position.
Remove the shipping retainer.
5. Slide module completely into position so the lip of the
module touches the front of the shelf.
6. Place another cell onto the shelf next to the previously
placed battery sleeve. Refer to the Assembly Drawing for
the cell polarity configuration. See Figure 19.
7. Install remaining cells working from the lower shelves to
the higher shelves. See Figures 20 and 21.
Module Retainers
1. For each battery module, install retainer plates and
spacers as required, using a M10x1.5 – 25mm Serrated
Hex Bolt. See Figure 22.
2. Torque to 20 ft-lbs.
Electrical Bonding Instructions
1. For each battery module, install one M6 Self-Tapping
Screw through front lip of the battery module into the
shelf/horizontal channel. See Figure 23.
2. For each retainer spacer, install one M6 Self-Tapping
Screw through the spacer into the horizontal channel.
See Figure 23.
INSTALL BONDING SCREW
FIGURE 23
INSTALL RETAINERS
FIGURE 22
INSTALL MODULES
FIGURE 21
16
NOTE:
The top row of the rack requires spacers to be installed
behind the upper lip of the battery modules. This spacer
is fastened into place with the retainer and retainer bolt.