1. Using the table below, record the IP address and the DNS address for the LAN side of the

gateway router.  Determine two unused static IP addresses used for each of the units in the

stack.  To learn how to do this, search “determining available static IP addresses” on the

desired search engine.

Table 2 – Local network settings

 

Information Title 

Site Info 

Notes 

Gateway LAN Address 
Primary DNS Address 
Secondary DNS Address 

Only use if known, otherwise 

leave blank. 

Available Static IP Address 1 

For master SkyBox 

Available Static IP Address 2 

For slave SkyBox 

Subnet Mask 

255.255.255.0 

Use for both units 

Next, on the master unit, arrow down once and make the following changes: 

2. Change the 

IP address

 to the value identified in the previous step for the master SkyBox.

3. Enter the 

Subnet mask, 255.255.255.0

.

4. Enter the 

Gateway LAN address

.

5. Arrow down once more.

6. Enter the 

Primary DNS

.

7. Tap 

Apply

 to save changes.

8. Repeat steps 3-7 on the slave unit, ensuring the IP address identified for the slave SkyBox

is used.

NOTE:

 The screens shown below are for reference only.  The values will vary from site to site.

 

Figure 7 – IP Address and DNS Menus 

Содержание OutBack Power SkyBox SBX5048-120/240

Страница 1: ...t power sold back to the grid In off grid operation the master unit controls only the AC output of the slave unit The slave unit maintains autonomy over its solar production and battery charging This...

Страница 2: ...ave its own battery bank Units cannot share the same battery bank as each controls its own battery monitoring program Before mounting the Skyboxes ensure enough room exists around each unit to accommo...

Страница 3: ...apid Shutdown Wiring Each SkyBox requires a connection between the rapid shutdown terminals for the inverter to operate Connect multiple units in series using the input and output terminals in each un...

Страница 4: ...ry rating of 5 or higher CAT5 cable Each SkyBox is equipped with two Ethernet ports one labeled WALL and the other SKYBOX When stacking SkyBoxes the master SkyBox has a connection from its WALL port t...

Страница 5: ...nit A Startup from battery will take approximately 45 60 seconds 2 Verify grid settings are the same between the units Network Settings SkyBox stacking requires static IP addressing in firmware versio...

Страница 6: ...Only use if known otherwise leave blank Available Static IP Address 1 For master SkyBox Available Static IP Address 2 For slave SkyBox Subnet Mask 255 255 255 0 Use for both units Next on the master...

Страница 7: ...Up To align the new settings between the SkyBoxes completely power down the system by opening all breakers Proceed through the following steps to re start the system If batteries are not present start...

Страница 8: ...ter SkyBox only Optional External CT If using external current transducers CT connect them to the master unit Enable this function on the master SkyBox only Home screen SkyBox icon Configure Edit arro...

Страница 9: ...unit requires a separate battery bank Q Version Match Verification Failure A This notification will appear when the firmware versions do not match between all units in the system This notification wil...

Страница 10: ...Commissioning Document 2019 OutBack an EnerSys company FA KF 10 11 2019 Page 10 of 12 Figure 11 AC wiring of two SkyBoxes...

Страница 11: ...OutBack Power Commissioning Document 2019 OutBack an EnerSys company FA KF 10 11 2019 Page 11 of 12 Figure 12 DC wiring of two SkyBoxes...

Страница 12: ...17825 59th Avenue N E Suite B Arlington WA 98223 USA Email Support outbackpower com Website http www outbackpower com Other OutBack Power assumes no responsibility or liability for loss or damage whe...

Отзывы: