29
0120011-J0 Rev M
Recommended torque values
#10-32
45 in-lbs.
Set the rotary dial to a
unique shelf ID before
mounting. Do not use
0
.
6�5 LPS36 Set Up: 19" and 23" Systems
6�5�1 Rack Mounting
NOTE:
Use thread forming screws with paint piercing washers to connect the LPS36 shelves
and fan assembly to the frame.
Use universal mounting brackets to mount the LPS36 shelf in a 19" or 23" rack. For bracket part numbers see sec-
tion "4.2.5 Mounting 19" Equipment in a 23" Rack" on page 19.
6�5�2 Shelf ID
6�5�3 Input and Output Wiring (19"/23")
This power system is suitable for installation as part of a Common Bonding Network (CBN) and is intended to be
used in a DC-I configuration (isolated from frame ground).
This system is intended to be used with a -48Vdc rectifier/ battery system at the input, and surge protectors and
line terminators at the output.
6�5�4 Wiring Chassis Ground
Protective earthing terminals are provided for chassis ground—two pair at the side and one pair at the rear (Figure
17).
1. Connect the power system chassis to the building master ground bus (MGB). This connection is necessary for
personnel safety and to meet many telco-grounding requirements.
2. Use minimum #6 AWG (16mm) copper wire and standard 2-hole crimp lugs for 1/4" studs on 5/8" centers.
3. Secure the lugs with #10-32 serrated flanged nuts (supplied) to provide the anti-rotation necessary for primary
ground connections.
NOTE:
Ground connections are bright electro tin plated class B as per ASTM B545-97 Class B.
No antioxidant is required before crimp connections are made.
Содержание alpha LPS36
Страница 1: ...LPS36 Line Power System Technical Guide 0120011 J0 Effective 07 2020...
Страница 2: ......
Страница 4: ......
Страница 85: ......