Accel CS
™
Installation Guide
Energy Kinetics Inc.
51 Molasses Hill Rd.
Lebanon, NJ 08833
800-323-2066
www.energykinetics.com
X:\TechDocs\Installation_Manuals\AccelCS_Quick_Install_Guide\AccelCS Quick Install Guide 02-26-19.doc
We have attempted to make your installation of the
Accel CS
boiler easy by pre-piping and pre-wiring a
complete system.
Note: These instructions are for quick reference only.
For complete instructions, refer to
“Owner and Installation Manual”
found inside top front cover.
Install Circulator to supply
flange. Bolts, gaskets and
flange located in component
box.
Return: Right termination
Use included 1” x 9” nipple
Return: Left termination
Use included 1” x 18” Nipple
Gas, Return and Drain Piping
Premier System: Install ½”
nipple, & Combo Boiler
Feed/Backflow Preventer
Stainless steel vent
w/ built in test port
2”/3” Direct Air Inlet
See diagram pg 2 fig A
3x2 Adaptor
for 2” venting
Insert into 3”PPS
adaptor. DO NOT
INSERT DIRECTLY
INTO STAINLESS
CONNECTION
Gas: Right termination
Gas: Rear termination
Condensate Trap: Fill with water prior to
startup. Make sure trap ball floats freely
before completing install.
Install Air Vent & Relief Valve
Remove hygroscopic air vent cap
when purging the system, and hand
tighten when placing into service.
3” Appliance adaptor
Use for all PPs
venting.