background image

Accel CS

™ 

Installation Guide 

Energy Kinetics Inc. 

 51 Molasses Hill Rd. 

 Lebanon,  NJ 08833 

 800-323-2066 

 

www.energykinetics.com

 

X:\TechDocs\Installation_Manuals\AccelCS_Quick_Install_Guide\AccelCS Quick Install Guide 02-26-19.doc 

 

 

We have attempted to make your installation of the 

Accel CS 

boiler easy by pre-piping and pre-wiring a 

complete system.   

Note: These instructions are for quick reference only.   
For complete instructions, refer to 

“Owner and Installation Manual”

 found inside top front cover. 

 
 
 

 

 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 

 

 
 
 
 
 
 
 
 
 

 
 
 
 
 

 
 
 
 
 
 
 

 

 

 

 

Install Circulator to supply 
flange.  Bolts, gaskets and 
flange located in component 
box. 

 

Return: Right termination   

Use included 1” x 9” nipple 

 

Return: Left termination 

Use included 1” x 18” Nipple 

Gas, Return and Drain Piping

 

Premier System: Install ½” 
nipple, & Combo Boiler 
Feed/Backflow Preventer 

Stainless steel vent 
w/ built in test port

 

2”/3” Direct Air Inlet 

See diagram pg 2 fig A 

 

3x2 Adaptor  

for 2” venting 

 Insert into 3”PPS 
adaptor.  DO NOT 
INSERT DIRECTLY 
INTO STAINLESS 
CONNECTION 

 

Gas: Right termination

 

Gas: Rear termination 

Condensate Trap: Fill with water prior to 
startup. Make sure trap ball floats freely 
before completing install. 

 

Install Air Vent & Relief Valve 

Remove hygroscopic air vent cap 

when purging the system, and hand 

tighten when placing into service. 

3” Appliance adaptor 
Use for all PPs 
venting. 