Accel CS Installation Instructions
Page 2
Energy Kinetics Inc.
51 Molasses Hill Rd.
Lebanon, NJ 08833
800-323-2066
www.energykinetics.com
X:\TechDocs\Installation_Manuals\AccelCS_Quick_Install_Guide\AccelCS Quick Install Guide 02-26-19.doc
Zone Valve for PHE
(Locate on boiler supply)
LEBANON, NJ 08833
C
H
Cold Water Supply
006 Bronze Circulator
w/Integral Flow Check
See "Smart Pump Wiring".
Backflush Drain
PHE (Plate Heat Exchanger)
Pipe boiler side and tank side
counter flow.
Dip Tube in Cold port
Heat Trap
Hot Water
to House
Combo Tee/Drain
Smart Pump Assembly
Adaptor 3/4" FTG X M
Tee 3/4" X 1/2" X 3/4"
Boiler Side Backflush (Optional)
1
2
" Ball Valve
Partially closing this valve will slow
the flow through the PHE and
increase the water temperature
entering the tank.
Use
3
4
" Copper to pipe
boiler side of PHE
PREMIER SYSTEM:
Heat & Hot Water
Hot Water Box
Smart pump with harness,
plate heat exchanger with
unions, fittings bag, zone valve
and hot water manual.
P
Premier System:
(2) 1” headers
with (5) ¾” ports, (2) C x M
adaptors, (2) ¾” copper caps.
Component Box
Boiler circulator, trap,
fittings bag, CO & gas
detector, Manager box
and manual.
Fittings bag
Smart thread sealant,
relief valve, air vent with
tubing, boiler drain,
nipple, ¾” tee, 1”x1”x3/4” tee,
bushing, circ. flange w/bolts.
Premier Box
(3) zone valves,
combo boiler feed/backflow
preventer and 8-Way treatment.
Tips:
1) Tighten all boiler stand screws
before moving.
2) Remove stand front panel for easier
piping access after boiler is set in
place. Keep yellow panels in place
when piping under boiler. Re-install
boiler stand panel when complete.
4 Way Intake Boot
: May be piped using
polypropylene ( mfg. by Centrotherm or
Durovent) or PVC.
Refer to installation manual
to determine the proper intake size.
3” Polypropylene
2” Polypropylene
2” PVC
w/field
supplied coupling
3” PVC
w/field
supplied coupling
Figure A