background image

Accel CS Installation Instructions

   

Page 2

 

Energy Kinetics Inc. 

 51 Molasses Hill Rd. 

 Lebanon,  NJ 08833 

 800-323-2066 

 

www.energykinetics.com

 

X:\TechDocs\Installation_Manuals\AccelCS_Quick_Install_Guide\AccelCS Quick Install Guide 02-26-19.doc 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 

 

Zone Valve for PHE

(Locate on boiler supply)

LEBANON, NJ 08833

C

H

Cold Water Supply

006 Bronze Circulator
w/Integral Flow Check

See "Smart Pump Wiring".

Backflush Drain

PHE (Plate Heat Exchanger)
Pipe boiler side and tank side
counter flow.

Dip Tube in Cold port

Heat Trap

Hot Water

to House

Combo Tee/Drain

Smart Pump Assembly

Adaptor 3/4" FTG X M

Tee 3/4" X 1/2" X 3/4"

Boiler Side Backflush (Optional)

1
2

" Ball Valve

Partially closing this valve will slow

the flow through the PHE and

increase the water temperature
entering the tank.

Use 

3
4

" Copper to pipe

boiler side of PHE

PREMIER SYSTEM:

Heat & Hot Water

 

 

Hot Water Box

 

Smart pump with harness, 
plate heat exchanger with 
unions, fittings bag, zone valve 
and hot water manual. 

P

Premier System:

 (2) 1” headers 

with (5) ¾” ports, (2) C x M 
adaptors, (2) ¾” copper caps.

 

 

Component Box 

Boiler circulator, trap, 
fittings bag, CO & gas 
detector, Manager box 
and manual. 

 

Fittings bag

 

Smart thread sealant, 
relief valve, air vent with 
tubing, boiler drain,  
nipple, ¾” tee, 1”x1”x3/4” tee,  
bushing, circ. flange w/bolts. 

 

Premier Box 

(3) zone valves, 
combo boiler feed/backflow 
preventer and 8-Way treatment. 

Tips:  

1) Tighten all boiler stand screws 

before moving.   

2) Remove stand front panel for easier 

piping access after boiler is set in 
place. Keep yellow panels in place 
when piping under boiler.  Re-install 
boiler stand panel when complete. 

4 Way Intake Boot

:  May be piped using 

polypropylene ( mfg. by Centrotherm or 
Durovent) or PVC.  

Refer to installation manual 

to determine the proper intake size. 

3” Polypropylene 

2” Polypropylene 

2” PVC 

w/field 

supplied coupling

 

3” PVC 

w/field 

supplied coupling 

Figure A 

Отзывы: