Energy Eye IR-05 Скачать руководство пользователя страница 9

10.  Once the sensor has been learned in and the proper jumper settings have been 

selected it will be necessary to attach the sensor to the base plate which you 

should have already mounted to the ceiling.  Simply line up the two mounting points 
and turn counter clockwise to mount the sensor (see following picture). 

 

11.  The sensor is now ready for use! Proceed to Section 7.0 

Installation Step 7  – 

Testing and Operation on page 42 of the Energy Eye Installation and Operations 
Manual to complete the installation of your Energy Eye System.   

 

Contact Information for Energy Eye

 
Energy Eye, Inc. 
9833 Pacific Heights Blvd. 
Suite H 

San Diego, CA 92121 USA 
 
Toll Free.   1 866 463 3135 

Ph. 

01 858 202 0001 

Fax. 

01 858 202 0008 

Web. 

www.energy-eye.com

 

Email: 

[email protected]

 

 

NOTES:____________________________________________________

___________________________________________________________

                                       

___________________________________________________________

 

___________________________________________________________

 

___________________________________________________________

 

___________________________________________________________

 

___________________________________________________________

___________________________________________________________
___________________________________________________________
___________________________________________________________ 

 

Energy Eye

 is a Registered Trademark and Energy Eye

 is a trademark of Energy Eye, Inc. 

©2006 Energy Eye, Inc. – All Rights Reserved –

 

Содержание IR-05

Страница 1: ...UDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION NOTICE Changes or modifications not expressly approved by the party responsible for compliance could void the user s authority to operate the equi...

Страница 2: ...assemble the product Doing so will void the Limited Warranty 6 USE ONLY APPROVED BATTERIES 7 The SENSOR should be installed by qualified personnel only 8 The Energy Eye receiver and sensors contain se...

Страница 3: ...sensor has been designed with the same proprietary radio coding that is found in other high quality Energy Eye wireless components and will not interfere with other sensors or wireless devices within...

Страница 4: ...tern of coverage Avoid installing 2 PIR detectors in one room protecting the same area Like all Energy Eye wireless components PIR should be less than 30 feet 10 meters from Controller Unit Optimal PI...

Страница 5: ...of this User Manual 1 Remove PIR sensor from its original packaging or container Use the supplied anchors and screws mount the base plate to the ceiling If the ceiling is made from Concrete it may be...

Страница 6: ...LE 1 Depress and hold the LEARN button while pressing the S4 TACT button THREE 3 TIMES then release You will notice the RED LED above position S4 flashing very slowly 2 The Controller is now looking f...

Страница 7: ...nal transmission Please skip to section 6 4 TESTING YOUR SENSORS on page 40 of yourEnergy Eye Installation and Operations Manual PLEASE IGNORE POINTS 8 and 9 as they do not apply to the EE IR 05 Senso...

Страница 8: ...ion of a typical guestroom smoke detector To activate this setting leave jumper P3 in place and make sure jumper P2 is in the lower position see following picture c LED INDICATION TEST SETTING This se...

Страница 9: ...Toll Free 1 866 463 3135 Ph 01 858 202 0001 Fax 01 858 202 0008 Web www energy eye com Email info energy eye com NOTES ____________________________________________________ ____________________________...

Отзывы: