Energy Eye IR-05 Скачать руководство пользователя страница 1

 

 

Energy Eye™   IR-05 

Advanced Wireless RF PIR Motion Sensor 

 

 

 
 

Installation & Operations Manual 

 

For Use With: 

EE-IR-05 Ceiling Mounted Wireless PIR Sensor 

12/2006 

 

 

 
 

THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES AND INDUSTRY CANADA RSS REGULATIONS. 

OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: 

 

(1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE AND 

 

(2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY 

CAUSE UNDESIRED OPERATION 

 

NOTICE: Changes or modificat ions not expressly approved by the party responsible for compliance could void the user’s 

authority to operate the equipment. 

 

IMPORTANT NOTE: To comply with the FCC RF exposure compliance requirements, no change to the antenna or the 

device is permitted. Any change to the antenna or the device could result in the device exceeding the RF exposure 

requirements and void user’s authority to operate the device.  

 

The term “IC:” before the radio certification number only signifies that Industry Canada Technical Specifications were met 

 
 
 

Содержание IR-05

Страница 1: ...UDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION NOTICE Changes or modifications not expressly approved by the party responsible for compliance could void the user s authority to operate the equi...

Страница 2: ...assemble the product Doing so will void the Limited Warranty 6 USE ONLY APPROVED BATTERIES 7 The SENSOR should be installed by qualified personnel only 8 The Energy Eye receiver and sensors contain se...

Страница 3: ...sensor has been designed with the same proprietary radio coding that is found in other high quality Energy Eye wireless components and will not interfere with other sensors or wireless devices within...

Страница 4: ...tern of coverage Avoid installing 2 PIR detectors in one room protecting the same area Like all Energy Eye wireless components PIR should be less than 30 feet 10 meters from Controller Unit Optimal PI...

Страница 5: ...of this User Manual 1 Remove PIR sensor from its original packaging or container Use the supplied anchors and screws mount the base plate to the ceiling If the ceiling is made from Concrete it may be...

Страница 6: ...LE 1 Depress and hold the LEARN button while pressing the S4 TACT button THREE 3 TIMES then release You will notice the RED LED above position S4 flashing very slowly 2 The Controller is now looking f...

Страница 7: ...nal transmission Please skip to section 6 4 TESTING YOUR SENSORS on page 40 of yourEnergy Eye Installation and Operations Manual PLEASE IGNORE POINTS 8 and 9 as they do not apply to the EE IR 05 Senso...

Страница 8: ...ion of a typical guestroom smoke detector To activate this setting leave jumper P3 in place and make sure jumper P2 is in the lower position see following picture c LED INDICATION TEST SETTING This se...

Страница 9: ...Toll Free 1 866 463 3135 Ph 01 858 202 0001 Fax 01 858 202 0008 Web www energy eye com Email info energy eye com NOTES ____________________________________________________ ____________________________...

Отзывы: