breakage  and  other  factors  that  lead  to  functional 
and  safety  failures  of  photovoltaic  modules.  When 
the  above  problems  occur,  the  supplier  must  be 
notified  in  time  to  replace  the  same  type  of 
photovoltaic modules. 

It  is  recommended  to  perform  a  preventive 
inspection  every  6  months,  and  do  not  replace  the 
components  of  the  photovoltaic  module  without 
authorization. 

If 

electrical 

or 

mechanical 

performance inspection or maintenance is required, 
it  is  recommended  that  qualified  professionals 
perform  the  operation  to  avoid  electric  shock  or 
personal injury. 

Routine maintenance measures should be taken to 
keep  the  photovoltaic  modules  free  of  snow,  bird 
droppings,  seeds,  pollen,  leaves,  branches,  dust, 
stains, etc. 

8.2  Photovoltaic module cleaning 

If the PV module has a sufficient tilt angle (at least 
15°),  it  is  usually  not  necessary  to  clean  the  PV 
module (rain will have a self-cleaning effect). If there 
is  a  lot  of  dirt  on  the  surface  of  the  photovoltaic 
module,  which  has  seriously  affected  the  power 
generation,  use  water  without  detergent  and  a  soft 
sponge  or  brush  to  rinse  the  photovoltaic  module 
array  when  it  is  cool  throughout  the  day.  Do  not 
scratch or wipe the dust when it is dry, otherwise it 

will  cause  tiny  scratches.  If  there  is  snow,  you  can 
use a brush with soft bristles to clean the surface of 
the photovoltaic module. 

 

For  more  detailed  instructions  related  to  cleaning 
and  maintenance,  please  refer  to  the  "Photovoltaic 
Module Cleaning Manual". 

 

Modified version and date 

· Rev1.0, released in January 2022. 

 

 

 

 

 

8 Star Energy Pty Ltd 

Level 35, 477 Collins St, 

Melbourne VIC 3000, Australia 

 

8 Star Energy ESS Ltd 

The Black Church, St Mary’s Place, 

Dublin DO7 P4AX, Ireland 

 

 

 

 

 

 

© 2021 Energizer. Energizer and certain graphic designs are trademarks of Energizer Brands, LLC and related subsidiaries and are used 

under license by 8 Star Energy Pty Ltd. All other brand names are trademarks of their respective owners. Neither 8 Star Energy Pty Ltd nor 

Energizer Brands is affiliated with the respective owners of their trademarks. 

Содержание Beam Series

Страница 1: ...ilicon PV Modules Installation Manual Version 1 0 Released in November 2021 This guide describes how to install the Energizer Solar Beam crystalline silicon PV modules To prevent improper operation be...

Страница 2: ...nergy ESS Ltd The Black Church St Mary s Place Dublin DO7 P4AX Ireland 1 Table of contents 1 Table of contents 2 2 Important notes 3 3 Laws and regulations 3 4 Safety measures 3 5 Handling and unpacki...

Страница 3: ...ntrol of 8 Star Energy Proprietary Limited hereafter 8 Star Energy this manual does not have any warranty meaning whether express or implied 8 Star Energy will not be responsible for any form of injur...

Страница 4: ...ive oil bone setting water thinner adhesive sheets that can generate oxime gas and potting glue only for connectors Such as KE200 CX 200 chemlok etc TBP plasticizer detergent etc to avoid chemical dam...

Страница 5: ...voltaic module and the installation surface should be kept to prevent the installation surface from touching the junction box When installing on the roof comply with the fire protection requirements o...

Страница 6: ...he original packaging box before installation Please protect the packaging from damage It is necessary to protect the safety of photovoltaic modules when unloading especially when hoisting roof projec...

Страница 7: ...e system design requirements the color of photovoltaic modules in the same row or square array should be the same 6 Mechanical installation 6 1 Installation conditions Recommended ambient temperature...

Страница 8: ...a third party testing organization with static mechanical analysis capabilities to meet the country region or corresponding international standards The photovoltaic module must be firmly fixed on the...

Страница 9: ...gure 4 or Figure 5 The 400mm pitch mounting hole size is 7x10mm and 4 x M6 stainless steel bolts are required Figure 5 Secure each bolt to the frame with stainless steel washers one for each side of t...

Страница 10: ...ar PV modules otherwise this may affect the modules operation or performance Be sure to avoid shadowing effects from the module clamps Weep holes on the module frame must not be closed or obscured by...

Страница 11: ...stallation method Figure 2 3 Fig 4 Fig 7 Fig 8 Fig 5 ENSP60M1 ENSP60M1 BL 1755 1038 30 1765 1048 35 1755 1038 30 1765 1048 35 5400Pa 2400Pa 5400 2400Pa Installation scope 400 50mm 1800 1800Pa Installa...

Страница 12: ...nditions a photovoltaic module is likely to experience conditions that produce more current and or voltage than reported at standard test conditions Accordingly the value of Isc marked on this module...

Страница 13: ...ng coil and wire clip must be used to fix it on the bracket Avoid direct sunlight and water soaking cables Please keep the connector dry and clean and make sure that the nut of the connector is tighte...

Страница 14: ...Note that the copper wire cannot be attached directly to the aluminum Put the bolt through the cut washer and then through the hole in the aluminum frame Add the spring washer and nut on the other si...

Страница 15: ...t necessary to clean the PV module rain will have a self cleaning effect If there is a lot of dirt on the surface of the photovoltaic module which has seriously affected the power generation use water...

Отзывы: