POM PDU User Manual Ver. 1.0
12
Control: Schedule
Control the assigned outlet by pre-set schedule.
Outlet: Assign the outlet that want to be controlled in this schedule.
Every: Set week’s day, assigned day or every day.
Date: When select “sgl” at column of “Every”, need to input the truly date here.
Action: Begin:
End:
ON
Turn on outlet at this time
None
OFF
Turn off outlet at this time
None
OFF/ON
Turn off outlet at this time
Turn on outlet at this time
ON/OFF
Turn on outlet at this time
Turn off outlet at this time
Active: Enable the assigned schedule control.