background image

 

 

 

 

 

 

 

 

 

 

Pager Module Installation 

Page 1

 

AW000924-B

 

 

Energate Foundation™ Pager Module Installation 

The optional RM41F pager module allows electricity providers to communicate remotely with the 
Energate Foundation™ Smart Thermostat and Home Energy Gateway. 
You can add a pager module to Foundation models FZ100 or FZ100C. 
The pager module ships with a cover that replaces the filler plate in Foundation’s casing after the module 
is installed. 

Installation 

To begin the pager module installation, remove the Foundation from the mounting bracket, even if it is 
not mounted on a wall. 

1.

 

Use a large flathead screwdriver to lift up the snap-fit tab located on top of the mounting bracket 

until you can pull the top of the Foundation away from the bracket. Then completely remove 

Foundation from the bracket. 

 

Note

: Be careful not to dislodge any wiring that is still connected on the back. 

 

    

If the screwdriver is too small, the tab and/or thermostat housing can be damaged. 

2.

 

Locate the covered USNAP module 

slot on the back of the Foundation. 

Use a small, flathead screwdriver to 

remove the filler plate. 

 

3.

 

Slide the pager module into the slot, ensuring that the tabs that position it are at the bottom, 

against the circuit board. Ensure that the module’s pin connector is completely inserted. 

4.

 

Snap the supplied cover over the tab 

end of the pager module slot. It 

should be flush with the side of the 

Foundation’s casing. 

5.

 

To re-attach the Foundation to the 

mounting bracket, position the 

Foundation in the bottom of the 

bracket using the bottom snap-fit tab. 

Gently push the Foundation into the 

rest of the bracket until the top tab 

snaps into place. 

6.

 

Wait for the Foundation to power up. 

 

Отзывы: