Pager Module Installation
Page 1
AW000924-B
Energate Foundation™ Pager Module Installation
The optional RM41F pager module allows electricity providers to communicate remotely with the
Energate Foundation™ Smart Thermostat and Home Energy Gateway.
You can add a pager module to Foundation models FZ100 or FZ100C.
The pager module ships with a cover that replaces the filler plate in Foundation’s casing after the module
is installed.
Installation
To begin the pager module installation, remove the Foundation from the mounting bracket, even if it is
not mounted on a wall.
1.
Use a large flathead screwdriver to lift up the snap-fit tab located on top of the mounting bracket
until you can pull the top of the Foundation away from the bracket. Then completely remove
Foundation from the bracket.
Note
: Be careful not to dislodge any wiring that is still connected on the back.
If the screwdriver is too small, the tab and/or thermostat housing can be damaged.
2.
Locate the covered USNAP module
slot on the back of the Foundation.
Use a small, flathead screwdriver to
remove the filler plate.
3.
Slide the pager module into the slot, ensuring that the tabs that position it are at the bottom,
against the circuit board. Ensure that the module’s pin connector is completely inserted.
4.
Snap the supplied cover over the tab
end of the pager module slot. It
should be flush with the side of the
Foundation’s casing.
5.
To re-attach the Foundation to the
mounting bracket, position the
Foundation in the bottom of the
bracket using the bottom snap-fit tab.
Gently push the Foundation into the
rest of the bracket until the top tab
snaps into place.
6.
Wait for the Foundation to power up.