Insulation monitoring using E-MCS 4.0
The operating personnel must check the function of the insu-
lation monitoring for every start-up by pressing the appropri-
ate test button (see also Chapter 6.3 Electrical safety check).
Fig. 5-2: Insulation monitoring using E-MCS 4.0
5.2.1
Insulation monitoring without switching off
(Standard for a DIN generator)
The following requirements must be met:
generator has been started (see 4.4)
Circuit breaker
(see Fig. 3-4-(1))
in Pos. 1
1.
Disconnect all consumers from the generator
2.
Press the test button
see Fig. 5-2-(1))
The displayed symbol
(see Fig. 4-6-(9))
and the horn indicate the
result:
Signal
Result
Symbol lights up red
Horn sounds
Insulation monitoring is OK
Symbol does not
light up and/or
the horn does not
sound
Insulation monitoring is defective
Table 5.2: Insulation monitoring without switching off
The insulation monitoring test has been run.
Important note
Requirements
Testing the insulation
monitoring:
(1)
(2)
Содержание ESE 604 DHG DIN
Страница 11: ...General information Status at October 2018 ESE 604 DHG ES DIN 11 Notes...
Страница 26: ...General Safety Regulations 26 ESE 604 DHG ES DIN Status October 2018 Notes...
Страница 33: ...Description of the power generator ESE 604 DHG DIN Status at October 2018 ESE 604 DHG ES DIN 33 Notes...
Страница 49: ...Operate power generator ESE 604 DHG DIN Status at October 2018 ESE 604 DHG ES DIN 49 Notes...
Страница 81: ...Troubleshooting Status at October 2018 ESE 604 DHG ES DIN 81 Notes...
Страница 85: ...Technical specifications Status at October 2018 ESE 604 DHG ES DIN 85 Notes...