Installation
Turbimax CUE21 / CUE22
10
Hauser
air. A fan located inside the device ensures that heated air circulates continuously around
the optical path and the flow-through cuvette.
3
4
5
1
2
1
A0026679
4
Installing the desiccant pouch
1
Securing screws
2
Electronic component
3
Humidity indicator
4
Desiccant pouch
5
Base of housing
1. Unscrew the four corner screws (item 1).
2. Remove the electronic component of the device (item 2).
3. Open the bag protecting the desiccant pouch (item 4), and place the pouch with the
humidity indicator (item 3) in the base of the housing (item 5).
Ensure that you install the desiccant pouch immediately after opening the bag to
prevent premature degradation of the desiccant.
4. Return the electronic component of the device to its original position.
5. Tighten the four corner screws.
To prevent premature saturation of the desiccant, it is recommended that you keep
the measurement chamber covered at all times.
4.2.3
Plumbing the measuring device
• The device requires only a very low overpressure in the flow assembly to operate,
approx. 0.069 bar (1 psi).
• The flow controller is rated for a maximum overpressure of 13.8 bar (200 psi).
• The minimum flow rate for the flow-through cuvette is 100 ml/min to 1 l/min
(0.026 to 0.26 US gal/min).
• The maximum permitted medium temperature is 50 °C (122 °F).
工程师电话(微信)15915717832
Содержание Turbimax CUE21
Страница 39: ...15915717832...
Страница 40: ...15915717832...