4 Wiring
Proline Promass 83 FOUNDATION Fieldbus
32
Hauser
4.4
Degree of protection
The devices fulfill all the requirements for IP 67. Compliance with the following points is mandatory
following installation in the field or servicing, in order to ensure that IP 67 protection is maintained:
• The housing seals must be clean and undamaged when inserted into their grooves. The seals must
be dried, cleaned or replaced if necessary.
• All threaded fasteners and screw covers must be firmly tightened.
• The cables used for connection must be of the specified outside diameter (see Page 95).
• Firmly tighten the cable entries (Fig. 21).
• The cables must loop down before they enter the cable entries (“water trap”, Fig. 21). This arran-
gement prevents moisture penetrating the entry. Always install the measuring device in such a
way that the cable entries do not point up.
• Remove all unused cable entries and insert plugs instead.
• Do not remove the grommet from the cable entry.
A0001914
Fig. 21:
Installation instructions, cable entries
Содержание Proline Promass 83
Страница 24: ...3 Installation Proline Promass 83 FOUNDATION Fieldbus 24 Endress Hauser ...
Страница 34: ...4 Wiring Proline Promass 83 FOUNDATION Fieldbus 34 Endress Hauser ...
Страница 64: ...6 Commissioning Proline Promass 83 FOUNDATION Fieldbus 64 Endress Hauser ...
Страница 66: ...7 Maintenance Proline Promass 83 FOUNDATION Fieldbus 66 Endress Hauser ...
Страница 90: ...9 Trouble shooting Proline Promass 83 FOUNDATION Fieldbus 90 Endress Hauser ...
Страница 116: ...Index Proline Promass 83 FOUNDATION Fieldbus 116 Endress Hauser ...
Страница 118: ...www endress com worldwide BA065D 06 en 12 04 50098623 FM SGML 6 0 ...