background image

Products

Solutions

Services

Brief Operating Instructions

Levelflex FMP53

FOUNDATION Fieldbus

Guided wave radar

These Instructions are Brief Operating Instructions; they are

not a substitute for the Operating Instructions pertaining to

the device.
Detailed information about the device can be found in the

Operating Instructions and the other documentation:

Available for all device versions via:

• Internet: 

www.endress.com/deviceviewer

• Smart phone/tablet: 

Hauser Operations App

KA01108F/00/EN/06.22-00

71565960

2022-04-05

Содержание Levelflex FMP53 FOUNDATION Fieldbus

Страница 1: ...s they are not a substitute for the Operating Instructions pertaining to the device Detailed information about the device can be found in the Operating Instructions and the other documentation Availab...

Страница 2: ...ord cd Ser no www endress com deviceviewer Endress Hauser Operations App XXXXXXXXXXXX XXXXX XXXXXX XXX XXXX XX Serial number 1 3 2 A0023555 2 About this document 2 1 Symbols 2 1 1 Safety symbols DANGE...

Страница 3: ...ls that must be connected to ground prior to establishing any other connections The ground terminals are located on the inside and outside of the device Inner ground terminal protective earth is conne...

Страница 4: ...uthorized by the plant owner operator Are familiar with federal national regulations Must have read and understood the instructions in the manual and supplementary documentation Follow instructions an...

Страница 5: ...with surfaces In the event of high medium temperatures ensure protection against contact to prevent burns 3 3 Workplace safety When working on and with the device Wear the required personal protectiv...

Страница 6: ...onment the degree of protection indicated on the nameplate is no longer valid This may also impair the safe operation of the device 3 5 1 CE mark The measuring system meets the legal requirements of t...

Страница 7: ...f the information on the measuring device and on the scope of the technical documentation pertaining to the device is displayed 4 3 Storage and transport 4 3 1 Storage temperature Permitted storage te...

Страница 8: ...ents when mounting Distance A between the vessel wall and rod probes For smooth metallic walls 50 mm 2 in For plastic walls 300 mm 12 in to metallic parts outside the vessel Distance B between rod pro...

Страница 9: ...curing screw using an open ended wrench 2 Rotate the housing in the desired direction 3 Tighten the securing screw 1 5 Nm for plastic housing 2 5 Nm for aluminum or stainless steel housing 5 2 2 Turni...

Страница 10: ...en the housing and main electronics module and plug the display module into the electronics compartment until it engages Closing the cover of the electronics compartment 1 2 2 5 Nm 3 mm A0021451 1 Scr...

Страница 11: ...nd 4 without integrated overvoltage protection 3 Connection switch output open collector terminals 3 and 4 with integrated overvoltage protection 4 Connection PROFIBUS PA FOUNDATION Fieldbus terminals...

Страница 12: ...ge E 2 wire FOUNDATION Fieldbus switch output G 2 wire PROFIBUS PA switch output Non hazardous Ex nA Ex nA ia Ex ic Ex ic ia Ex d ia XP Ex ta DIP CSA GP 9 to 32 V 3 Ex ia IS Ex ia Ex d ia IS XP 9 to 3...

Страница 13: ...Connect the potential matching line to the outer ground terminal before applying the power supply Required tools accessories For devices with a cover lock Allen key AF3 Wire stripper When using strand...

Страница 14: ...sing shielded cables Connect the cable shield to the ground terminal 6 2 3 Plug in spring force terminals The electrical connection of device versions without an integrated overvoltage protection is v...

Страница 15: ...compartment 2 Turn the securing clamp 90 in the clockwise direction and using an Allen key 3 mm tighten the screw of the securing clamp on the connection compartment cover with 2 5 Nm 7 Operation opt...

Страница 16: ...or symbol if an error is active 1 2 Measured value symbols 1 3 Measured value 1 4 Unit 2 Measured value display bar graph 1 value 2 1 Bar graph for measured value 1 2 2 Measured value 1 including unit...

Страница 17: ...8 Display module 1 Operating keys Key assignment Key Navigate down in the picklist Edit the numerical values or characters within a function Key Navigate up in the picklist Edit the numerical values...

Страница 18: ...rement should generally be completely configured Setup Mapping Mapping of interference echos Setup Advanced setup Contains additional submenus and parameters For more customized configuration of the m...

Страница 19: ...l display appears Calling up the menu via the context menu 1 Open the context menu 2 Press to navigate to the desired menu 3 Press to confirm the selection The selected menu opens 8 Commissioning 8 1...

Страница 20: ...0 Operation Setup Main menu 0104 1 Display language English Espa ol Fran ais Display language English Deutsch 0104 1 Espa ol Fran ais Display language English Deutsch 0104 1 Betrieb Setup Hauptmen Spr...

Страница 21: ...t D Distance E Empty calibration zero point L Level F Full calibration span 1 Setup Device tag Enter device tag 2 Setup Distance unit Select the length unit 3 Setup Tank type Select tank type 4 Setup...

Страница 22: ...easured level L for verification purposes 9 Setup Distance Displays the distance D between the reference point R and the level L for verification purposes 10 Setup Signal quality Displays the signal q...

Страница 23: ......

Страница 24: ...www addresses endress com 71565960 71565960...

Отзывы: