Commissioning
Flowmeter Proline 500 – digital
38
Hauser
8
Commissioning
8.1
Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist → 12
• "Post-connection check" checklist → 31
8.2
Setting the operating language
Factory setting: English or ordered local language
X X X X
X X X
X
X
20.50
Operation
Setup
Main menu
0104-1
Display language
English
Español
Français
Display language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Display language
English
Deutsch
0104-1
Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
XX
XX
1.
2.
3.
4.
A0029420
7
Taking the example of the local display
Содержание FOUNDATION Proline 500 digital
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...www addresses endress com...