Electrical connection
Flowmeter Proline 500
28
Hauser
Connecting the sensor connection housing via terminals
8 mm
1.
2.
10 (0.4)
6.
5.
2 x
3.
22 mm
7.
24 mm
A0029617
1. Release the securing screw of the housing cover.
2. Open the housing cover.
3. Push the cable through the cable entry . To ensure tight sealing, do not remove the
sealing ring from the cable entry.
4. Strip the cable and cable ends. In the case of stranded cables, fit ferrules.
5. Connect the protective ground.
6. Connect the cable in accordance with the connecting cable terminal assignment
7. Firmly tighten the cable glands.
This concludes the process for connecting the connecting cables.
8. Close the housing cover.
9. Tighten the securing screw of the housing cover.
Содержание Flowmeter Proline 500
Страница 47: ......
Страница 48: ...www addresses endress com 71574815 71574815 ...