4
Installation
4.1
Storage and transport
The packaging material used to store or trans-
port the instrument must provide shock and
moisture protection. Optimal protection
is provided by the original packaging materi-
als. Conformance with the ambient conditions
(see »Technical data«) must be assured.
4.2
Unpacking
Verify that the contents are undamaged. In-
form the post office or freight carrier as well
as the supplier of any damage.
Check that the delivery is complete and
agrees with the shipping documents and your
order:
• Quantity delivered
• Instrument type and version according to
the nameplate (see section 3.3)
• Operating instructions
• Identification card(s)
Save the original packaging in case the de-
vice must be stored or shipped at a later time.
If you have any questions, please consult
your supplier or the Hauser sales
office in your area (see back cover of these
operating instructions for addresses).
Included in delivery:
• CPC 20-M.PN..
Switch cabinet with mounting kit
Operating Instructions
• CPC 20-M.ID..
Switch cabinet with mounting kit
Operating Instructions
Inductive proximity switches to Namur
• CPC 20-C.PN..
Switch cabinet with mounting kit
Operating Instructions
• CPC 20-C.ID..
Switch cabinet with mounting kit
Inductive proximity switches
• CPC 20Z-MPN..
Switch cabinet with mounting kit
Operating Instructions
Switch cabinet key
Ex conformity certificate
• CPC 20Z-MID..
Switch cabinet with mounting kit
Operating Instructions
Switch cabinet key
Inductive proximity switches to Namur
Ex conformity certificate
4
Installation
autoclean CPC 20 / CPC 20 Z
8
Hauser