Operating Instructions
________________________________________________
Operation
1. Plug the mains lead into Mains Inlet (1) and into a power supply
socket.
2. Place sieves onto the shaker as described in
Sieve Stacking
.
3. Switch the power on at the power supply socket. The green l.e.d.
(Mains) will be energized.
4. Switch on the Mains Switch (2). The green l.e.d. (Power) will be
energized.
5. Set Process Timer (5) to required sieving time. The equipment will
immediately start and automatically switch off upon completion of
the set time.
NOTE: The shaker can be stopped at any time by turning the
Process Timer knob anti-clockwise to ‘0’. Unscrew the two
clamping handwheels and the two side handle levers on the clamp
plate. Slide the clamp plate up the rods to remove. The nest of
sieves may now be removed and the quantity of the sample on each
sieve analysed.
Take Care that there are no loose sieves on the shaker !
Do not attempt to remove the sieves before the shaker has
come to a halt
Do not unscrew clamping handwheels or side handle lever
while the shaker is in operation
- 12
-