providing the option of a superior control system to give power references for
the ECpvh to follow.
3. “Monitoring” provides a high level overview of the installation as well as detailed
information about each individual inverter and power meter.
4. “Control” gives access to set up of ECpvh controller related parameters such as IP
configuration, Internal clock handling etc.
5. “Settings” give access to setup of site specific parameters such as number and
ratings of genset, grid connections, and inverters, which power meters are used,
power and reactive control schemes etc.
6. “Logs” give access to setup of log specific parameters.
7