ENAR QGH Скачать руководство пользователя страница 3

EXTENSIBLE DOUBLE BEAM VIBRATING SCREEDS

 

en

 

2

INTRODUCTION 

Thank you for trusting the 

ENAR

 brand.

 

For the maximum performance of the equipment, we recommend to read carefully the safety 
recommendations, maintenance, and usage listed in this manual.

 

Defective parts should be replaced immediately to avoid major problems. 
The effective longevity of the equipment will increase if the manual instructions are followed. 
We will be glad to help you with any comments or suggestions in reference to our equipment. 

8-800-555-58-36

                      

 

www.VibroMotors.ru 

                    

i

[email protected]

Содержание QGH

Страница 1: ...iones Instruction manual Manuel d instructions Gebrauchsanweisungen MX 460 1406 REGLAS VIBRANTES FIJAS Y EXTENSIBLES FIXED AND EXTENSIBLE VIBRATING SCREEDS REGLES VIBRANTES FIXES ET EXTENSIBLES AUSDEH...

Страница 2: ...TING STARTED 7 4 2 EXTENSION CABLES 7 4 3 PERIODIC MAINTENANCE 8 4 4 STORAGE 9 4 5 TRANSPORTATION 9 5 ELECTRIC SCHEME QP QPM 9 6 LOCATING MALFUNCTIONS 10 7 INSTRUCTIONS TO ORDER SPARE PARTS 10 7 1 INS...

Страница 3: ...safety recommendations maintenance and usage listed in this manual Defective parts should be replaced immediately to avoid major problems The effective longevity of the equipment will increase if the...

Страница 4: ...by an eccentric weight assembled with bearings inside a steel housing This housing also works as an oil tank for lubricating the bearings A belt transmits the movement from the engine assembled on fou...

Страница 5: ...Clamp Beam Transport handle Switch support clamp Pulling handle Pulling handle Clamp Beam Transport handle Pulling handle Pulling handle Transport handle Engine Fuel tank Oil filler cap Stop button S...

Страница 6: ...ERSONAL SAFETY STAY ALERT watch what you are doing and use common sense when operating a power tool DO NOT USE TOOL while tired or under the influence of drugs alcohol or medication DRESS properly DO...

Страница 7: ...motor manufacturer s manual before working Do not work in closed rooms the exhaust fumes may be toxic Wait 2 minutes for the petrol refill until the motor gets colder 11 When working with an electric...

Страница 8: ...ling the screed from the pulling handles 7 When the work is finished always remove the fresh concrete that has been settling on the beams and the motor before it gets dry 8 When a defect or a malfunct...

Страница 9: ...eaded gas clean the gas spelt 9 Idle speed of the motor must not exceed 3 000 rpm standard set By every maintenance operation the idle speed of the engine has to be checked and adjusted at 3 000 rpm S...

Страница 10: ...cause any damage 5 ELECTRIC SCHEME QP QPM CABLE SCHEME FOR ONE PHASE MOTOR CONNECTED AT 220 V QPM 1 PLUG 2P Earth 2 CABLE TO SWITCH SECTION 1 5 mm2 3 EARTH CABLE green yellow 1 5mm2 4 EARTH CONNECTION...

Страница 11: ...mend including the MACHINE SERIAL NUMBER 2 The identification plate with serial and model number is located as shown in the point 2 of this manual 3 Let us to know the right shipping instructions incl...

Страница 12: ...of concrete mass 2 When the mass is prepared the screed is laid over the concrete mass with the motor running at the top speed and you must pull the handles slightly in order not to spring over the su...

Отзывы: