R-5210
Page 5
SR-18T Clearances (Figure 3)
When facing the front of the appliance the following minimum clearances
to combustible construction must be maintained.
Left side 6 inches (152mm). Right side 6 inches (152mm).
Do not install in alcove or closet.
Rear wall 0 inches (0mm). Ceiling 36 inches (914mm).
Minimum vertical clearance from a projection above the
appliance (shelves, window sills, etc.) 36 inches (914mm).
Floor (top surface of carpeting, tile, etc.) 2 inches (51mm).
Provide adequate clearances around air openings.
Adequate accessibility clearances for purposes of servicing and proper
operation must be provided.
Figure 3 (SR-18T)
SR-10T Clearances (Figure 1 and Figure 2)
When facing the front of the appliance the following minimum clearances
to combustible construction must be maintained.
Left side 6 inches (152mm). Right side 6 inches (152mm).
Do not install in alcove or closet.
Rear wall 0 inches (0mm). Ceiling 24 inches (610mm).
Minimum vertical clearance from a projection above the
appliance (shelves, window sills, etc.) 14 inches (356mm).
Maximum horizontal extension of projection above the appliance
12 inches (305mm).
Floor (top surface of carpeting, tile, etc.) 2 inches (51mm).
Provide adequate clearances around air openings.
Adequate accessibility clearances for purposes of servicing and proper
operation must be provided.
Figure 1 (SR-10T)
Figure 2 (SR-10T)
14" MIN
(356mm)
24 " MIN
(610mm)
2 " MIN
(51mm)
12" MAX
(305mm)
0" (0mm) CLEARANCE
TO REAR WALL
24 " MIN
(610mm)
2 " MIN
(51mm)
6 " MIN
(152mm)
6 "MIN
(152mm)
14" MIN
(356mm)
36" (914mm) MIN
6" (152mm)
MIN
6" (152mm)
MIN
2" (51mm)
MIN
Содержание SR-10T-2
Страница 14: ...Page 14 R 5210 SR 10T ...
Страница 15: ...R 5210 Page 15 SR 18T ...
Страница 16: ...Page 16 R 5210 SR 30T ...