![Empire Heating Systems PVS18N-3 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/empire-heating-systems/pvs18n-3/pvs18n-3_owners-manual-and-installation-instructions_2404217032.webp)
37873-0-0217
Page 32
Notice:
The vent terminal elbow does not contribute to the
overall vent length measurement. For each 45° elbow in
-
stalled in the run, the length of the run MUST be reduced by
1.5 feet (45 cm). Reduce the length of the run three feet (91.4
cm) for every 90° elbow.
All vent components are supplied by the installer.
Figure 53
Calculation example of vent run maximum 50 feet
Figure 53
displays a two-pipe vertical installation. The first 90° el
-
bow must be added to the total vent length. The equivalent length
of the second 90° elbow also needs to be added to the total length.
The equivalent length of the third elbow does not need to be added
since it is the termination. The total horizontal vent length of the flue
system is 14 feet, and the total vertical length is 30 feet. The two
90° elbows are equivalent to six feet, bringing the total to 50 feet.
Notice:
For vertical termination, the exhaust must be a minimum
of three inches above the inlet air pipe. The inlet must be at least
twelve inches from the roof line or the maximum expected snow
level as indicated in
Figure 54.
ROOF PITCH
H (Min.)
Flat to 6/12
12” (305 mm)
6/12 to 7/12
15” (381 mm)
Over 7/12 to 8/12
18” (457 mm)
Over 8/12 to 16/12
24” (610 mm)
Over 16/12 to 21/12
36” (914 mm)
Determining Minimum Vent Height Above the Roof
Figure 54
WARNING
Major U.S. building codes specify minimum chimney and/or vent
height above the rooftop. These minimum heights are neces-
sary in the interest of safety. These specifications are summa
-
rized in
Figure 54.
WALL FURNACE INSTALLATION
DIRECT VENT EXAMPLES
Содержание PVS18N-3
Страница 7: ...37873 0 0217 Page 7 OWNER S MANUAL AND OPERATION INSTRUCTIONS www empirezoneheat com...
Страница 13: ...37873 0 0217 Page 13 INSTALLATION INSTRUCTIONS www empirezoneheat com...
Страница 45: ...37873 0 0217 Page 45 APPLIANCE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...
Страница 46: ...37873 0 0217 Page 46 APPLIANCE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...
Страница 55: ...37873 0 0217 Page 7 GUIDE D UTILISATION ET INSTRUCTIONS D INSTALLATION www empirezoneheat com...
Страница 61: ...37873 0 0217 Page 13 INSTRUCTIONS D INSTALLATION www empirezoneheat com...